Thursday, April 5 at 08:45
- Notes from the previous 24 hours:
- Beam convergence adjustment by Todd
- Beam issues off and on through Swing and Owl shifts
- fADC125 module failure in FDC. Rapid access used by Sascha and Cody to replace.
- Other DAQ issues ~1hr for swing + owl
- Issues:
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- TAGH had few tripped channels with no alarm sounding
- High Level monitoring plots look bad (calibrations)
- Bubblers
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- Reports:
- Run Plan
- TAC run using V-wire today (pending good AC lock)
- Production Running
- AOB
Friday, April 6 at 08:45
- Notes from the previous 24 hours:
- Some issues getting stable beam through the day except for ~1hr over lunch
- V-wire setup late afternoon
- TAC run postponed
- TAC/PS efficiency tests
- Empty target and raw mode run
- Production running overnight
- Running until May 6 official.
- 3 month down time likely
- Issues:
- Multiple peaks in profiler (AC lock?) (Hovanes)
- BCAL Occupancy (Elton)
- Hot channel in TAGH
- Reports:
- Rates with the 75 um and 750 um Be converters (Alexandre)
- Calibration Updates (Sean)
- Low Level Monitoring Report (Thomas)
- Run Plan
- Beam down for 2-4 hours for Hall-B pass change
- SSP (trigger studies) 1h (Sascha)
- CODA 3.08 Test 1h (Sergey)
- CDC Rate studies? (Lubomir)
- Production Running
- AOB
Saturday, April 7 at 10:00
--- NO MEETING ---
Sunday, April 8 at 10:00
--- NO MEETING ---
Monday, April 9 at 08:45
- Notes from the previous 72 hours:
- Mostly stable beam over weekend
- CDC Intensity scan completed Friday
- Hot FCAL channel causing higher trigger rate Saturday lost ~5hr
- Sensor failure in tagger dump on Sunday lost ~6.5hr
- Some issues getting stable beam through the day except for ~1hr over lunch
- Issues:
- Eugene and Elton are out of town. Beni is Hall leader
- Multiple peaks in profiler (AC lock?) (Hovanes)
- BCAL Occupancy (Elton)
- Hot channel in TAGH
- Reports:
- Rates with the 75 um and 750 um Be converters (Alexandre)
- Calibration Updates (Sean)
- Low Level Monitoring Report (Thomas)
- Run Plan
- Beam down for 2-4 hours for Hall-B pass change
- SSP (trigger studies) 1h (Sascha)
- CODA 3.08 Test 1h (Sergey)
- CDC Rate studies? (Lubomir)
- Production Running
- AOB