Run Planning Meeting Notes, Mar 14 - Mar 20, 2019
From GlueXWiki
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx daily meeting
- PrimEx-η run plan
- Production runs, number of triggers
- Trigger counter
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Friday, Mar. 15 at 08:45
- Past 24 hours:
- Short access after meeting
- gluon01 is back with a new kernel and graphics driver
- Production running
- Issues
- Problematic FCAL channels near beamline
- One base lost connection and was recovered by power cycling the power supply. This happens 1-2 times per week. Right now I (Colin) am the only one capable of doing this. Need to train more people how to spot and fix these errors. It is a relatively simple process, but one that should not be left to the shift crew.
- One base lost HV near beam line.
- Reports
- Today:
- Production: 200nA, Al 10-4
- Run Plan
- Production running
- TAC run
Thursday, Mar. 14 at 08:45
- Past 24 hours:
- Production running
- Issues
- RootSpy Problem with CCAL Pedestal Histograms
- Hall D y position variation from Jay. Beam position variation not related to dispersion.12
- Console 1 frozen. Who knows how to reboot?
- Reports
- Rate monitoring (Alexandre)
- FCAL shift in simulation (Liping)
- Beni really wanted to conitune our discussion yesterday on histogram binning (Beni)
- Today:
- Production: 200nA, Al 10-4
- Run Plan
- Production running
- Hall C goes down Sunday at 4pm. Postpone TAC run until Monday unless there are objections.
- There are parity quality beam testes (PQB) scheduled for Hall A Monday and Tuesday, but this should not affect the beam delivered to us.
- RF Recovery scheduled for Wednesday