2020 Data Production
From GlueXWiki
Contents
[hide]Run Ranges
- Batch 1: 71350 - 71591 (150/250 nA)
- Batch 2: 71592 - 71727 (350 nA)
- Batch 3: 71728 - 71835 (350 nA)
- Batch 4: 71836 - 71942 (350 nA)
- Batch 5: XX-XX (350 nA)
Proposed Schedule
Finalize Calibrations & Performing Monitoring Launch
- Batch 1: April 1st
- Batch 2: April 15st
- Batch 3: ...
Ready for Production
- Batch 1: May 1st
- Batch 2: May 15st
- Batch 3: ...
Run-dependent Calibrations
Calibration | Person | Run Range |
---|---|---|
Overall Timing (first pass) | Sean Dobbs | 71336 - 71557 |
Overall Timing (post-ST updates) | Sean Dobbs | 71336 - 71800 |
CDC wire gains | Naomi Jarvis | 70000 - 71797
71798 - 71859 71860 - |
CDC overall gains | Naomi Jarvis | 71336 - 71800
except 71409 & 71754 |
CDC dE/dx | Naomi Jarvis | 71350 - 71800
except 71409, 71594 and empty target runs 71461, 71532, 71533 |
CDC time-to-distance | Naomi Jarvis | 71336 - 71800
except 71409 & 71754 |
PS/PSC Timing | Olga Cortes | 71336 - 71700 |
TAGH timewalks | Olga Cortes | |
TAGM timewalks | Sean Dobbs/Richard Jones | 71615 - 71800 |
TOF | Beni Zihlmann | 70000-71994 |
DIRC | Justin Stevens |
Overall Calibrations
Calibration | Person | Status |
---|---|---|
BCAL channel timing | Mark Dalton | Done |
BCAL attenuation length/gain ratio | Mark Dalton | In prog. Unexpected changes |
BCAL z-position | Mark Dalton | |
BCAL gains/non-linearities | Karthik Suresh | In prog. Gains change |
FCAL gains/non-linearities | Colin Gleason | |
FCAL timing | Colin Gleason | |
SC Timewalks | Rupesh Dotel | Done |
SC Propagation Time | Rupesh Dotel | Testing |
Reconstruction Checks
Need to verify that current reconstruction code is performing as well or better than what was used for 2018-01/2018-08-ver02
Reports
- Alex Austregesilo
Analyses
Simulation
Quantity | Person | Run Range |
---|---|---|
CDC hit thresholds | Naomi Jarvis | 71336 - 71859 |
CDC wire mc efficiency | Naomi Jarvis | 70000 - 79999 (may need updates) |