May 20, 2022 Tech group SAD meeting
From GlueXWiki
Meeting Time and Place =
Friday May 20, 2022 10:30am Hall D Counting House and Teams
Agenda
- Safety - Electrical HV
- Key validation due this month
- Hall will most likely be locked up 2 weeks from today!
- First wave of FCAL2 PR approved $17K for Support plates, $24K cooling blocks waiting for signature
- Accelerator schedule - HCO in full gear https://cebaf.jlab.org/calendar/
- Hall D SAD Tasks
- CPP INstall Completed
- Adjust Lead absorber procedure
- Change Target procedure
- PS Parasitic Detectors stages - low priority
- FCAL Insert Module fabrication
- 60 brass straps per week needed now?
- matching mu metal to steel shields
- cutting tool
- Moving tent end of June to EEL 108
- Tagger NMR repair and HCO - Scot
- Tagger controls/network switch UPS
- Solenoid HCO - complete
- Downstream vacuum pipe install - complete - turn pump back on in final HCO
- Add casters to Microscope stand
- CPP INstall Completed
- TEDF work area move in June to test lab high bay or ESB
- FCAL Insert Drawings - 98% complete
- need cooling pipe to chiller assy
- need dark room mod for electronic patch panels
- need to complete 0200 final assy dwg
- need installation drawing
- Procurement plan developed
- New Profiler install - not until August - new plates arrived
- New 3x3 CCAL for TAC - cabling to be done
- DIRC water skid and fiber hookup
- Controls
- FDC chiller cooling water flow -
- FDC start up procedure with set point error - restarted yesterday, any issues?
- HCO started...https://accweb.acc.jlab.org/hco/readiness?categoryId=&systemId=®ionId=&groupId=&qualified=
- General Maintenance
- On Call - Keith
- ePAS Training and trial https://www.jlab.org/esh/epas
- Tidy Friday? Thorough cleaning next week?
Action Items
- Complete HCO