Thursday February 16
Past 24 hours
- HARP scan results
- No beam between 9am and 12am (beam came back at midnight)
- CCAL transported to experimental hall and fixed to its platform by Scot and his team
Shift Reports
Reports
- Rebooting NMR meter and its IOC (Hovanes)
- target LCW temperature alarm (Alexandre)
- Noise on some TPOL channels. Data should be good enough. (Michael Dugger)
- Statistics balance
- PARA 0/90: 20.7%
- PERP 0/90: 20.2%
- PARA 45/135: 21.1%
- PERP 45/135: 19.7%
- AMO : 18.3%
Issues
Pending:
- TAGM discriminator TRG scaler gone wild
- Start Counter (Beni) - We do not understand why there is a mismatch in the software between start counter and tracking.
- BCM calibration. Alexandre recommends that we request a recalibration of AD00C BCM.
Plans
- Install CCAL whenever there is an extended accelerator downtime
- Restricted Access is needed to be able to use the ramp <-done
- Cabling
- Survey is needed
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 2 runs PERP (0/90)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)