Run Coordinator report:2025run w6

From GlueXWiki
Revision as of 11:21, 7 May 2025 by Ijaegle (Talk | contribs)

Jump to: navigation, search

Week 6: Run Planning Meeting Notes, May 1 - May 7, 2025 Run Planning Meeting Notes, May 1 - May 7, 2025

During week 6, we transitioned from commissioning to production mode. During the first two days, the beam was down most of the time. When we finally received beam, we noticed that the main trigger was missing due to a faulty channel in the FCAL FADC. This FADC module was swapped. The shift crews had to relearn the diamond sequence, including how to switch between different diamond orientations and how to transition between diamond and AMO. In the process of relearning, some mistakes were made. These mistakes were not only due to crew members being out of practice, but also a result of suboptimal instructions from the experts. In total we collected during this week:

    • AMO: 0.80B
    • PARA 0/90 deg: 2.57B
    • PERP 0/90 deg: 2.50B
    • PARA 45/135 deg: 2.45B
    • PERP 45/135 deg: 2.45B