Minutes-4-22-2010
From GlueXWiki
April 15, 2010 FDC meeting
Tentative Agenda
- Production
- Update on the off-site production space floor plan
- UVA wire stringing equipment (Brian) pin rail2
- Updates on:
- Electronics: finalizing the PCB design Readout_left, HV_right, HV_left, Readout_right (Fernando, Kim)
- Cathode redesign (Bill, Roger)
- Tests of the new frame prototype (Lubomir)
- Full scale prototype
- Three-layer HV tests (Beni)
- Preparations for cosmics tests
- Other