Minutes-4-22-2010
From GlueXWiki
April 22, 2010 FDC meeting
Tentative Agenda
- Production
- UVA wire stringing equipment (Brian): pin rail2, pin rail, pos meas cam, pos meas , pos meas parts, pretension screw, string table
- off-site production space planning
- Updates on:
- Electronics: PCB, cable procurement status (Fernando)
- Cathode redesign (Roger)
- FDC cabling (Bill)
- Full-scale prototype
- status (Lubomir)
- grounding problems (Fernando)
- cosmics tests (Beni)
- Other
Minutes
Participants: Bill, Roger, Brian, Glenn, Chuck, Mark, Simon, Beni, Eugene, Lubomir
Production
- Brian reported on his visit at UVA. The parts at UVA, two pin rails (~2m each) and the parts of the position measurement system, are in good condition and can be used. Brian thinks that the stringing of the FDC at JLab using the UVA procedure/equipment is doable; the number of the wires is not that big to require winding machine. Brian and Bill discussed some possible improvements related to the way the pin rails are attached to the table/ strong hold