Action Items from previous meetings

  1. Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl)
  2. Chris to check HV specs on coax cable. (Needs to hold at least 80 V).

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Other?
  5. Mechanical (Jim)
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)
  10. Granularity (Elton)

Minutes

Attending: