Aug 16, 2011 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 13:42, 16 August 2012 by Elton (Talk | contribs) (Tentative Agenda)

Jump to: navigation, search

Action Items from previous meetings

  1. Test wrapping forms (Elton)
  2. Decide on how to a store sorted SiPMs in preparation for installation (Fernando and Chris)
  3. Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)\
  4. Review requirement of 2.5 reduced gain reduction (Elton)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (Yi)
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup (Scot via e-mail)

Minutes

Attending: