Mar 26, 2013 Calorimetry
From GlueXWiki
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Monitoring
- Supply a draft specification for preparing the surfaces of the FCAL plexiglass sheet (Athens)
- SiPM
- After summary of SiPM parameters, provide data to Hamamatsu for comments (USM)
Tentative Agenda
- Announcements
- Action Items
- Monitoring
- FCAL
- BCAL
- USM Report File:20130326.pdf
- SiPM Measurements at Regina
- Reconstruction and Simulation
- TDR update
- Calibration of Calorimeters
- Any other business
Minutes
Attendees:Elton, Tim, Yi, David, Beni (JLab); Kei, Matt (IU); Zisis, Andrei (UofR); Will, Hayk, Alam, Elias (USM); Christina, Stratos, Pavlos (Athens)
- Announcements
- Action Items
- Monitoring
- Almost all material in hand
- LEDs have not yet arrived. (Note: Zisis said that they were shipped 8 days ago and expect arrival in a few days)
- Boards will start soon and be tested for functionality. Athens will check pulse sizes relative to requirement.
- Stratos will work on the plexiglass specs. Once testing is completed, a piece of the prototype in Athens will be shipped to JLab as a sample.
- FCAL
- BCAL
- USM Report File:20130326.pdf
- All measurements have been completed at USM. The next-to-last box (640 sensors) should have arrived yesterday at JLab. The last shipment (370 sensors) was sent out yesterday.
- The 3 non-conforming sensors will be shipped to JLab. Jlab will return them to Hamamatsu for replacement.
- Final testing on the forty original sensors on loan to USM (from the first article) will be completed in the next week and they should be shipped back in about a week. They will make linearity measurements on these sensors.
- SiPM Measurements at Regina
- USM Report File:20130326.pdf
- Reconstruction and Simulation
- TDR update
- Calibration of Calorimeters
- Any other business