February 9, 2015

From GlueXWiki
Revision as of 09:42, 9 February 2015 by Somov (Talk | contribs) (Created page with " * Firmware update and algorithm testing : - TI, FADC250 (BCAL, PS/PSC, ST, TAGM/TAGH) : - Change jumpers/switches on SD boards for bcal crates (Sergei P.) : - connect TI trigge...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Firmware update and algorithm testing
- TI, FADC250 (BCAL, PS/PSC, ST, TAGM/TAGH)
- Change jumpers/switches on SD boards for bcal crates (Sergei P.)
- connect TI trigger front panel output to F1 TDCs
- Check trigger performance with play back - in progress
  • Trigger algorithm study for the spring run
FCAL trigger tuning
decreasing integration window size (time).
- propagation time for MIPs (MC simulation)
- cable length, PMT transit time spread
- check with acquired data
FCAL thresholds tuning
- check rates with MC simulation (MC)
- MIP response
Coincidence of FCAL with other sub-detectors
- require tracks in ST
- energy correlation with BCAL
- combined trigger base on BCAL/ST correlations and FCAL thresholds
  • Level-1 Monitor