Run Planning Meeting Notes, Feb 16-Feb 22, 2017
From GlueXWiki
<- Back to Run Coordination Meetings: Spring 2017 Run
Thursday, February 16
- Accelerator Status
- Stable accelerator running over the last 24 hours
- Harp scans:
- MCC scans [before https://logbooks.jlab.org/entry/3458630] and [after https://logbooks.jlab.org/entry/3458638] Todd's script
- "Good enough -- horizontal convergence is nearly spot on, and vertical convergence is a little shallow but ok."
- Our scan: [before https://logbooks.jlab.org/entry/3458624] and [after https://logbooks.jlab.org/entry/3458635] Todd's script
- In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
- Before: (1.31, 0.63), (1.08, 0.73), (1.03, 0.41)
- After : (1.07, 0.51), (0.79, 0.50), (0.78, 0.32)
- MCC scans [before https://logbooks.jlab.org/entry/3458630] and [after https://logbooks.jlab.org/entry/3458638] Todd's script
- Convergence studies from Hovanes: [Feb 15 https://logbooks.jlab.org/entry/3458654] vs [Feb 9 https://logbooks.jlab.org/entry/3458258]
- Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9)
- "... uncertainties ... a lot larger compared to Feb 9. It is hard to make any conclusions about the improvement of the spot."
- Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9)
- Hall-D/GlueX items
- RootSpy tips:
- Restarting cMsg server: [1]
- RootSpy tips:
- Monitoring
- Run Plan
- Production data
- Hall safety walk-through is supposed to happen between 7:00 AM and 7:30 AM
- Offline Analysis?
- Any Other Business?