Run Planning Meeting Notes, Apr 19-Apr 25, 2018
From GlueXWiki
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, April 19 at 08:45
- Notes from the previous 24 hours:
- Convergence was adjusted
- Current scan completed
- Production running
- Issues:
- Reports:
- Results from material scan (Sergey and Lubomir)
- Results from thin diamond, 3.4 mm hole. FDC currents drop, not CDC PS flux comparison PS enhancement increases
- First results from current scan [1] [2] [3]
- CDC current correlation with Y beam position observed again (Beni)
- Run Plan
- Access today to
- Move active collimator to 5 mm hole
- Attach Pb radiator to profiler
- Muon chamber inspection
- Production running
- Harp scan when beam comes back
- Fast raster scan deferred until the required people can be found
- Future studies
- Access today to
- AOB