Repairs made to TAGH scintillator counters over the summer of 2019

From GlueXWiki
Revision as of 12:45, 26 June 2019 by Irrigw (Talk | contribs) (Created page with " == Overview == During the second week of June 2019, 5 counters were removed from the TAGH. These counters all had scintillators that were loosely connected to their respectiv...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Overview

During the second week of June 2019, 5 counters were removed from the TAGH. These counters all had scintillators that were loosely connected to their respective light-guides and were believed to not be functioning properly.


Initial State of the Counters

Scintillators

Light-Guides

Testing Counters

Precautions