All public logs
From GlueXWiki
Combined display of all available logs of GlueXWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 16:20, 23 January 2012 Elton (Talk | contribs) uploaded a new version of File:Comparison.pdf (Added points )
- 09:11, 20 January 2012 Elton (Talk | contribs) uploaded File:Comparison.pdf (Review of PDE measurements in literature)
- 09:08, 20 January 2012 Elton (Talk | contribs) uploaded File:Gain calculation.pdf (Comparison of current vs rate in SiPM)
- 11:26, 17 January 2012 Elton (Talk | contribs) uploaded File:NIMA620-217.png (Figure 8 from NIMA620 (210) p 220.)
- 12:02, 8 November 2011 Elton (Talk | contribs) uploaded File:IMG 0793.JPG (Athens monitoring 2)
- 11:59, 8 November 2011 Elton (Talk | contribs) uploaded File:IMG 0794.JPG (Athens monitoring 1)
- 09:07, 8 November 2011 Elton (Talk | contribs) moved page USM Construction Readiness Review Checklist to USM SiPM Testing Readiness Review Checklist (Better description of Readiness Review)
- 17:35, 2 November 2011 Elton (Talk | contribs) moved page Oct 27, 2011 SiPM Electrical and Cooling to Nov 3, 2011 SiPM Electrical and Cooling (wrong date)
- 17:12, 18 October 2011 Elton (Talk | contribs) moved page Replacement Solenoid Meetings to Spare Solenoid Meetings (Change name of solenoid)
- 17:37, 12 October 2011 Elton (Talk | contribs) moved page Oct 13, 2011 SiPM Electrical and Cooling to Oct 20, 2011 SiPM Electrical and Cooling (change date)
- 10:12, 4 October 2011 Elton (Talk | contribs) moved page Replacement Solenoid to Spare Solenoid (change name)
- 07:55, 19 September 2011 Elton (Talk | contribs) uploaded File:Cost layer1.pdf (Estimated cost of adding an additional layer to the Bcal)
- 16:49, 13 September 2011 Elton (Talk | contribs) uploaded File:HallB-runschedule.pdf (Hall B tentative run schedule fall 2011, spring 2012)
- 17:34, 7 September 2011 Elton (Talk | contribs) moved page Sep 9, 2011 SiPM Electrical and Cooling to Sep 8, 2011 SiPM Electrical and Cooling
- 09:21, 6 September 2011 Elton (Talk | contribs) uploaded File:BCAL Monitoring PCB.pdf (Geometry for location of Bcal Monitoring board.)
- 17:55, 5 September 2011 Elton (Talk | contribs) moved page Sep 13, 2011 Readout to Sep 6, 2011 Readout over redirect (wrong date)
- 17:53, 5 September 2011 Elton (Talk | contribs) moved page Sep 6, 2011 Readout to Sep 13, 2011 Readout (wrong date)
- 17:21, 25 August 2011 Elton (Talk | contribs) moved page Aug 18, 2011 SiPM Electrical and Cooling to Aug 25, 2011 SiPM Electrical and Cooling (Aug 18 cancelled)
- 17:55, 3 August 2011 Elton (Talk | contribs) moved page Aug 1, 2011 SiPM Electrical and Cooling to Aug 4, 2011 SiPM Electrical and Cooling (wrong date)
- 15:19, 22 July 2011 Elton (Talk | contribs) uploaded File:Geom dt jul22.pdf (Toy MC studies)
- 14:22, 12 July 2011 Elton (Talk | contribs) uploaded File:Npe Ngamma.pdf (Bcal Dynamic Range)
- 10:02, 27 June 2011 Elton (Talk | contribs) uploaded File:Nitronic rod.pdf (nitronic rod drawing for SNS)
- 09:52, 27 June 2011 Elton (Talk | contribs) uploaded File:SummaryofLASS HallDCoilAxialForces.pdf (Forces on existing coils for comparison with new coil calculated with ANSYS, axial forces on sub-coils/coils for various configurations.)
- 17:33, 20 June 2011 Elton (Talk | contribs) uploaded File:Questions to JLAB.pdf (Replacement solenoid questions for Meeting June 22)
- 13:21, 31 May 2011 Elton (Talk | contribs) uploaded File:TLG production status 30052011.pdf (Light production status at USM)
- 07:55, 24 May 2011 Elton (Talk | contribs) uploaded File:LED study-2 v1-1.pdf (LED_study-2_v1-1.pdf)
- 09:46, 12 May 2011 Elton (Talk | contribs) moved page May 17, 2011 Readout to May 31, 2011 Readout (cancelled)
- 08:59, 27 April 2011 Elton (Talk | contribs) uploaded File:Bcal guide spectra.pdf (Light transmission vs wavelength for the Plastic Craft light guides in comparison to a production Fcal UVT guide)
- 08:43, 7 April 2011 Elton (Talk | contribs) uploaded File:Guides testing Apr6.pdf (Test setup for crude measurement of guide transmission)
- 08:17, 7 April 2011 Elton (Talk | contribs) uploaded File:Guides testing Apr6.pdf (Test setup for quick transmission measurement)
- 09:37, 6 April 2011 Elton (Talk | contribs) uploaded File:PlasticCraft12 chip.JPG (Chip on #12 light guide from Plastic Craft)
- 09:09, 6 April 2011 Elton (Talk | contribs) uploaded File:Plot guides c1.pdf (Histogram of differences from nominal dimensions)
- 09:06, 6 April 2011 Elton (Talk | contribs) uploaded File:Test guides12.pdf (Dimensional measurements of prototype guides)
- 08:43, 6 April 2011 Elton (Talk | contribs) uploaded File:PlasticCraft12.JPG (Twelve prototype light guides from Plastic Craft)
- 08:42, 6 April 2011 Elton (Talk | contribs) uploaded File:PlasticCraft1.JPG (Photo of one light guide with a quarter for scale)
- 14:15, 4 April 2011 Elton (Talk | contribs) moved page Apr 4, 2011 Readout to Apr 5, 2011 Readout (wrong date)
- 12:58, 17 March 2011 Elton (Talk | contribs) moved page Mar 24, 2011 Readout to Mar 22, 2011 Readout (wrong date)
- 16:36, 23 February 2011 Elton (Talk | contribs) moved page Feb 24, 2011 Calorimetry to Mar 3, 2011 Calorimetry (wrong date)
- 16:30, 23 February 2011 Elton (Talk | contribs) moved page Feb 21, 2011 Calorimetry to Feb 24, 2011 Calorimetry (wrong date)
- 12:30, 20 January 2011 Elton (Talk | contribs) moved page Jan 21, 2011 SiPM Electrical and Cooling to Jan 20, 2011 SiPM Electrical and Cooling (wrong date)
- 10:58, 20 January 2011 Elton (Talk | contribs) moved page Jan 13, 2010 Calorimetry to Jan 20, 2010 Calorimetry (wrong date)
- 15:19, 15 December 2010 Elton (Talk | contribs) moved page Jan 10, 2011 Readout to Jan 13, 2011 Readout (Wrong date)
- 17:34, 12 November 2010 Elton (Talk | contribs) moved page Nov 14, 2010 Calorimetry to Nov 17, 2010 Calorimetry (wrong date)
- 17:33, 12 November 2010 Elton (Talk | contribs) moved page Nov 11, 2010 Calorimetry to Nov 14, 2010 Calorimetry
- 10:39, 21 October 2010 Elton (Talk | contribs) uploaded File:Trapezoidal guide eff.png (Figure 22 from GlueX-doc-1432)
- 09:48, 5 August 2010 Elton (Talk | contribs) uploaded File:Plot threshold1.png (Estimated Bcal thresholds as a function of dark rate)
- 18:09, 28 July 2010 Elton (Talk | contribs) moved page July 30, 2010 Readout to July 29, 2010 Readout (incorrect date)
- 10:47, 20 May 2010 Elton (Talk | contribs) uploaded File:Dynamic range.pdf (Npe from GlueX-doc-1474)
- 08:43, 6 May 2010 Elton (Talk | contribs) uploaded File:SiPM contracting timeline v0.pdf (Timeline for SiPM procurement and interface to contract with USM)
- 17:53, 27 April 2010 Elton (Talk | contribs) uploaded File:Plot resolutions c5.png (Figure-of-merit based on FOM ~ 1/(R_{EM} x omega width))