Run Planning Meeting Notes, November 18 - November 24, 2021
From GlueXWiki
Thursday November 18
- Last 24h:
- ~1.4 B triggers (250M AMO): [1]
- Down from ~8:45 am -> 9:30 pm due to 4th pass RF separator problem
- Repair plan: down at ~10 am for ~30 minutes, then acc will decide if full system needs to be down for repair for longer time
- Some discussion regarding using magnetic separation for 1 hall running if down more than 30 minutes
- Issues:
- writing on tape?
- High temperature of locked-up FCAL bases? [2]
- Shift crew will take over servicing FCAL base lock ups. wiki instructions
- Plan:
- Continue production at 150nA on diamond
- Analysis update