Run Planning Meeting Notes, June 23 - June 29, 2022
From GlueXWiki
Revision as of 15:27, 22 June 2022 by Njarvis (Talk | contribs) (Created page with "↑ Back to Run Coordination Meetings:Summer2022 Meeting are via ZoomGov: [https://jlab-org.zoomgov.com/j/1601990060?pwd=TUtwTGszMFg5bjhwdC9nU0IvREUzZz09 connect] (Meetin...")
↑ Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Thursday June 23
- Last 24h:
- Wed evening: The target is out already. Sasha will set up the straight track trigger, then start the TAC run at whatever beam current was chosen earlier.
- Shift Summaries
- Reports
- Issues
- Tagger NMR
- DIRC sensor
- DAQ livetime
- Beam position stability
- U1-10-TOP MPOD crate
- Plans
- No beam from 6:30am until sometime after 3pm, power shedding.
- Walk-through at 11am
- Commissioning steps temporarily postponed:
- Flux optimization/Act .Col. calibration
- Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.