November 04, 2022 Tech group meeting
From GlueXWiki
Meeting Time and Place =
Friday November 04, 2022 9:30am TED 2559 and Teams
Agenda
- Safety - HDList
- All self assessments complete, Thanks! supervisors to complete by Thanksgiving!
- Update Individual Career Profile
- Physics all hands meeting December 6
- January Schedule 3rd-14th
- Get DIRC operational
- Install new .o25 orifice
- Fill optical boxes
- Modify Tagger Microscope
- Install New Profiler
- Remove ComCal - yes
- Install GEM
- BCAL/FDC chiller swap
- Air compressor relief test
- Goniometer run through axis
- Get DIRC operational
- Hall D current Tasks
- FCAL Insert Module fabrication
- brass straps
- matching mu metal to steel shields - 200 more to go
- FCAL2 Design tidbits
- Monitoring panel discussion - Stephanie
- need cooling pipe to chiller assy
- need dark room mod for electronic patch panels, need to complete 0200 final assy dwg
- need installation drawing
- insert plexiglass, outer plexiglass
- Tungsten
- Insulation
- Scaffolding on temporary platform?
- Electronic patch panels
- Liftable frame mods
- Cable trays
- drip pan
- FCAL2 Assembly
- Assemble FCAL2 step plates/cooling blocks - S&A completed on lower half
- Epoxy fittings to Cooling Manifold
- Weld water manifold supports
- Bend/solder copper tubes - complete
- Epoxy fittings to tubes and leak check
- JBweld conductive epoxy tubes to blocks
- HDList updates - weekly!
- KLONG dwgs
- FCAL Insert Module fabrication
- Controls - Bobby is responsible for PLC - training next week
- General Maintenance
- On Call -
- ePAS Training and trial https://www.jlab.org/esh/epas