Fig. 1 CCAL moved to the ESB
Fig. 2 Removing CCAL modules
Fig. 3 CCAL modules on the shelf
Fig. 4 All modules removed
Fig. 1 CCAL module
Fig. 2 CCAL module taken apart
Fig. 3 LMS plastic cap attached to the crystal face