Controls Meeting 27-Jun-2024

From GlueXWiki
Revision as of 16:09, 20 June 2024 by Hovanes (Talk | contribs) (Created page with "* Announcements * Solenoid status ** PXI controller test with Windows (Brian) ** New PLC controller (Josh) ** Alarm limits for solenoid PVs from PXI (Tim, Beni) * Power outag...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Announcements
  • Solenoid status
    • PXI controller test with Windows (Brian)
    • New PLC controller (Josh)
    • Alarm limits for solenoid PVs from PXI (Tim, Beni)
  • Power outage lessons
  • PLC developments (Bobby, Josh)
    1. ECAL chillers
      • Chiller power
      • Flow monitoring
    2. Dark room environment sensors
    3. Fan control and fan status monitoring
    4. ECAL HV crate resets and HV board interlocks
    5. EPICS screens & L5X file
    6. Archiving and alarms for PLC-based PVs
  • ECAL and FCAL voltage controls (Hovanes)
  • Linux version for servers hosting EPICS IOC-s (Hovanes)
  • Other items


Time/Location

10:00am Thursday 27-June-2024