FCAL2 Readiness Review
Location
Date: February 14, 2025
Time: 9 am EST
Room: Video conference using BlueJeans
Zoom Meeting Connection information
Experiments: E12-12-002 and E12-12-002A
Charge [1]
Committee members: Stepan Stepanyan, Patrizia Rossi, Ed Folts, Neville Malabre-O'Sullivan, TBD
ERR Agenda
8:45-9:00: Executive sesstion
9:00-9:40: "Status of the ECAL commissioning" (35+5) A. Somov (addressing charges 1, 2, 3, 5, and 6)
9:40-10:05: "Status of the FCAL part" (20+5) M. Albrecht (addressing charges 1, 3, and 6)
10:05-10:25: "Engineering design of the detector frame and cooling system" (15+5) T. Whitlatch (addressing charge 2)
10:25-10:45: "Integration of the ECAL into the GlueX framework" (15+5) A. Somov (addressing charge 4)
10:45-11:15: "Shower reconstruction and FCAL2 detector calibration" (25+5) S. Taylor (addressing charge 5)
11:30-12:30: Executive session
12:30: Closeout
Documentation
Supplementary Material
- CCAL performance and FCAL2 module design, Nucl.Instrum.Meth.A 1013 (2021) 165683
- NIM paper on the crystal properties, Nucl.Instrum.Meth.A 956 (2020) 163375
- Lead tungstate calorimeter of the Jefferson Lab Eta Factory experiment, Proceedings of the CALOR 2024 conference
- A new active base of photomultiplier R4125 designed for the lead tungstate calorimeter, Presented at the 2024 IEEE NSS MIC conference
- The GlueX beamline and detector, Nucl.Instrum.Meth.A 987 (2021) 164807