List of ECAL LMS runs

From GlueXWiki
Revision as of 09:15, 28 March 2025 by Somov (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Location of files:

on gluons:

/gluonraid5/data4/rawdata/volatile/RunPeriod-2025-01/rawdata/Run130056


the files should be copied to the cache disk accessible from ifarms

/cache/halld/RunPeriod-2025-01/rawdata


ECAL North

Run Number Date (time) Events Comments
130042 Nov-2, 21:15 200 k HP LED pulser set to 8 V, pulse width 110, optical fibers have not been fixed
130043 Nov-2, 21:28 200 k HP LED pulser set to 6 V (narrow pulse)

ECAL South

Run Number Date (time) Events Comments
130100 Dec-14, 20:00 60 k HP LED pulser set to 8 V, pulse width 110, HVs set to 1040 V
130101 Dec-14, 20:05 60 k HP LED pulser set to 5 V, pulse width 110, HVs set to 1040 V
130102 Dec-14, 20:15 60 k HP LED pulser set to 5 V, pulse width 110, HVs set to 1040 V



ECAL HVs switched on on the entire detector

Config: ECAL_led_m10.conf

The HP generator is used to drive the ECAL LEDs.


Run Number Date (time) LED voltage High voltage Events
130148 Dec-22, 19:38 8 V 1040 V 63 k
130149 Dec-22, 19:43 7 V 1040 V 62 k
130150 Dec-22, 19:46 6 V 1040 V 40 k
130151 Dec-22, 20:01 7 V 1000 V 14 k
130152 Dec-22, 20:03 7 V 980 V 23 k
130153 Dec-22, 20:06 7 V 960 V 20 k
130154 Dec-22, 20:08 7 V 900 V 20 k
130155 Dec-22, 20:10 7 V 850 V 18 k
130156 Dec-22, 20:14 7 V 925 V 16 k


Start checking the entire detector

Run Number Date (time) LED voltage High voltage Events Comments
130174 Jan-9, 17:26 8 V 1040 V 60 k Haven't change anything since December 22
130198 Jan-13, 16:32 8 V 1040 V 60 k Haven't change anything since December 22


Worked on the top south region

Run Number Date (time) LED voltage High voltage Events
130200..... 1 means with amp display Jan-14, 12:04 8 V 1040 V 120 k


Fixed most channels: (-11,-17) bad cable, (-11,17) unstable amplitude (replace divider), (18,17) and related (replace flash adc, rocecal1, slot18), (-16,2) and (-16, 4) replaced dividers and reconnect PMT, (-14,2) secure divider connection

This is a reference run, when all waveform look Ok

Run Number Date (time) LED voltage High voltage Events
130220, 130221 Jan-15, 19:30 8 V 1040 V 150 k

January 23

Run Number Date (time) LED voltage High voltage Events
130302 Jan-23, 14:26 8 V 1040 V 32 k (DC crashed)
130303 Jan-23, 14:49 8 V 1040 V 39 k (DC crashed)
130304 Jan-23, 15:07 8 V 1040 V 39 k (DC crashed)


February 15

A lot of maintenance work inside the dark room. The first check after everything was fixed

Run Number Date (time) LED voltage High voltage Events
130368 Feb 15, 16:00 8 V 1040 V 39 k (DAQ crashed) 7 new bad channels TN:3, BN: 2, TS:1 BS:1
130369 Feb 15, 16:27 8 V 1040 V 23 k (DAQ crashed)

February 16, Installed new LMS light source

We found 7 bad channels after maintenance work in the dark room

Top North: (2,17) hard to fix, (15,6), (15,20)

Bottom North: (14,-1), (1, -2)

Top South: (-15, 13)

Bottom South: (-15, -1)

Run Number Date (time) LED voltage High voltage Events
130373 Feb 16, 17:51 20 V new power supply 1040 V 31 k
130374 Feb 16, 18:05 20 V new power supply 1040 V 31 k (the same conditions)
130375 Feb 16, 18:05 20 V new power supply Individual voltages (ECAL_HV_27_Jan_2025_18_24_05.snap) 34 k


February 18, Fixed 7 modules

Took 1.5 days to fix them

Run Number Date (time) LED voltage High voltage Events
130378 Feb 18, 10:44 20 V new power supply 1040 V 31 k


March 4, A lot of maintenance work, have not checked all channels since Feb 18

Remote voltage control from MPOD

Run Number Date (time) LED voltage High voltage Events
130390 March 4, 15:50 25 V new bias voltage supply 1040 V 6 k
130391 March 4, 16:21 20 V new bias voltage supply 1040 V 70 k


March 15, A lot of maintenance work (reinforce fan support, fix LG modules, have not checked all channels since March 4

2 modules with disconnected dividers, (12,20) problems with the HV distribution board, (13, 3) unstable amplitude, divider replaced

Run Number Date (time) LED voltage High voltage Events
130650 March 15, 15:50 20 V bias voltage supply Nominal voltages 15 k
130657,130658, 130662 March 18, 16:10 20 V new bias voltage supply 1040 V 100 k
130663 March 19, 11:12 20 V new bias voltage supply Nominal HVs, module (13,3) has not yet been fixed 30 k


March 20, fixed most issues

Run Number Date (time) LED voltage High voltage Events
130667 March 20, 21:15 20 V bias voltage supply Nominal voltages 20 k


March 26, fixed most issues

No work with the the ECAL modules. The module pattern is the same as in to 130667.

Run Number Date (time) LED voltage High voltage Events
130669 March 26, 16:00 20 V bias voltage supply, Switch the MPOD LV from "term" to "sense". The sense voltage is 4.5 V Nominal voltages 5 k
130670 March 26, 16:45 20 V bias voltage supply, Switch the MPOD LV from "term" to "sense". The sense voltage is 4.5 V Nominal voltages 34 k



Run 130174


Run 130220


Run 130302


Run 130373

New LMS light source, 7 bad channels after maintenance in the dark room


Run 130378


Run 130390

Run 130650

Run 130662


Run 130663


Run 130667


Run 130669

Changed settings of MPOD voltages to sensor. The pattern of modules is the same as in 130667