List of ECAL LMS runs
Location of files:
on gluons:
/gluonraid5/data4/rawdata/volatile/RunPeriod-2025-01/rawdata/Run130056
the files should be copied to the cache disk accessible from ifarms
/cache/halld/RunPeriod-2025-01/rawdata
ECAL North
Run Number | Date (time) | Events | Comments |
---|---|---|---|
130042 | Nov-2, 21:15 | 200 k | HP LED pulser set to 8 V, pulse width 110, optical fibers have not been fixed |
130043 | Nov-2, 21:28 | 200 k | HP LED pulser set to 6 V (narrow pulse) |
ECAL South
Run Number | Date (time) | Events | Comments |
---|---|---|---|
130100 | Dec-14, 20:00 | 60 k | HP LED pulser set to 8 V, pulse width 110, HVs set to 1040 V |
130101 | Dec-14, 20:05 | 60 k | HP LED pulser set to 5 V, pulse width 110, HVs set to 1040 V |
130102 | Dec-14, 20:15 | 60 k | HP LED pulser set to 5 V, pulse width 110, HVs set to 1040 V |
ECAL HVs switched on on the entire detector
Config: ECAL_led_m10.conf
The HP generator is used to drive the ECAL LEDs.
Run Number | Date (time) | LED voltage | High voltage | Events |
---|---|---|---|---|
130148 | Dec-22, 19:38 | 8 V | 1040 V | 63 k |
130149 | Dec-22, 19:43 | 7 V | 1040 V | 62 k |
130150 | Dec-22, 19:46 | 6 V | 1040 V | 40 k |
130151 | Dec-22, 20:01 | 7 V | 1000 V | 14 k |
130152 | Dec-22, 20:03 | 7 V | 980 V | 23 k |
130153 | Dec-22, 20:06 | 7 V | 960 V | 20 k |
130154 | Dec-22, 20:08 | 7 V | 900 V | 20 k |
130155 | Dec-22, 20:10 | 7 V | 850 V | 18 k |
130156 | Dec-22, 20:14 | 7 V | 925 V | 16 k |
Start checking the entire detector
Run Number | Date (time) | LED voltage | High voltage | Events | Comments |
---|---|---|---|---|---|
130174 | Jan-9, 17:26 | 8 V | 1040 V | 60 k | Haven't change anything since December 22 |
130198 | Jan-13, 16:32 | 8 V | 1040 V | 60 k | Haven't change anything since December 22 |
Worked on the top south region
Run Number | Date (time) | LED voltage | High voltage | Events |
---|---|---|---|---|
130200..... 1 means with amp display | Jan-14, 12:04 | 8 V | 1040 V | 120 k |
Fixed most channels: (-11,-17) bad cable, (-11,17) unstable amplitude (replace divider), (18,17) and related (replace flash adc, rocecal1, slot18), (-16,2) and (-16, 4) replaced dividers and reconnect PMT, (-14,2) secure divider connection
This is a reference run, when all waveform look Ok
Run Number | Date (time) | LED voltage | High voltage | Events |
---|---|---|---|---|
130220, 130221 | Jan-15, 19:30 | 8 V | 1040 V | 150 k |
January 23
Run Number | Date (time) | LED voltage | High voltage | Events |
---|---|---|---|---|
130302 | Jan-23, 14:26 | 8 V | 1040 V | 32 k (DC crashed) |
130303 | Jan-23, 14:49 | 8 V | 1040 V | 39 k (DC crashed) |
130304 | Jan-23, 15:07 | 8 V | 1040 V | 39 k (DC crashed) |
February 15
A lot of maintenance work inside the dark room. The first check after everything was fixed
Run Number | Date (time) | LED voltage | High voltage | Events |
---|---|---|---|---|
130368 | Feb 15, 16:00 | 8 V | 1040 V | 39 k (DAQ crashed) 7 new bad channels TN:3, BN: 2, TS:1 BS:1 |
130369 | Feb 15, 16:27 | 8 V | 1040 V | 23 k (DAQ crashed) |
February 16, Installed new LMS light source
We found 7 bad channels after maintenance work in the dark room
Top North: (2,17) hard to fix, (15,6), (15,20)
Bottom North: (14,-1), (1, -2)
Top South: (-15, 13)
Bottom South: (-15, -1)
Run Number | Date (time) | LED voltage | High voltage | Events |
---|---|---|---|---|
130373 | Feb 16, 17:51 | 20 V new power supply | 1040 V | 31 k |
130374 | Feb 16, 18:05 | 20 V new power supply | 1040 V | 31 k (the same conditions) |
130375 | Feb 16, 18:05 | 20 V new power supply | Individual voltages (ECAL_HV_27_Jan_2025_18_24_05.snap) | 34 k |
February 18, Fixed 7 modules
Took 1.5 days to fix them
Run Number | Date (time) | LED voltage | High voltage | Events |
---|---|---|---|---|
130378 | Feb 18, 10:44 | 20 V new power supply | 1040 V | 31 k |
March 4, A lot of maintenance work, have not checked all channels since Feb 18
Remote voltage control from MPOD
Run Number | Date (time) | LED voltage | High voltage | Events |
---|---|---|---|---|
130390 | March 4, 15:50 | 25 V new bias voltage supply | 1040 V | 6 k |
130391 | March 4, 16:21 | 20 V new bias voltage supply | 1040 V | 70 k |
March 15, A lot of maintenance work (reinforce fan support, fix LG modules, have not checked all channels since March 4
2 modules with disconnected dividers, (12,20) problems with the HV distribution board, (13, 3) unstable amplitude, divider replaced
Run Number | Date (time) | LED voltage | High voltage | Events |
---|---|---|---|---|
130650 | March 15, 15:50 | 20 V bias voltage supply | Nominal voltages | 15 k |
130657,130658, 130662 | March 18, 16:10 | 20 V new bias voltage supply | 1040 V | 100 k |
130663 | March 19, 11:12 | 20 V new bias voltage supply | Nominal HVs, module (13,3) has not yet been fixed | 30 k |
March 20, fixed most issues
Run Number | Date (time) | LED voltage | High voltage | Events |
---|---|---|---|---|
130667 | March 20, 21:15 | 20 V bias voltage supply | Nominal voltages | 20 k |
March 26, fixed most issues
No work with the the ECAL modules. The module pattern is the same as in to 130667.
Run Number | Date (time) | LED voltage | High voltage | Events |
---|---|---|---|---|
130669 | March 26, 16:00 | 20 V bias voltage supply, Switch the MPOD LV from "term" to "sense". The sense voltage is 4.5 V | Nominal voltages | 5 k |
130670 | March 26, 16:45 | 20 V bias voltage supply, Switch the MPOD LV from "term" to "sense". The sense voltage is 4.5 V | Nominal voltages | 34 k |
Run 130174
Run 130220
Run 130302
Run 130373
New LMS light source, 7 bad channels after maintenance in the dark room
Run 130378
Run 130390
Run 130650
Run 130662
Run 130663
Run 130667
Run 130669
Changed settings of MPOD voltages to sensor. The pattern of modules is the same as in 130667