July 22, 2009 CDC Meeting
From GlueXWiki
Contents
Meeting Time and Place
Friday July 22, 2009 at 3:00pm At Jefferson Lab, the meeting will be held in room ARC 428
Connections
To connect from the outside, please use ESNET
1.) ESNET: 8542553
2.) Phone:
+1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
then enter participant code: 77438230# (remember the "#")
Agenda
- CDC
Action Items/Decisions from Previous Meeting
- Discussed high prices for tight tolerance components
- Checked IDEAL tool and manufacturing in Chicago. No listing
- Tim to discuss with vendor repair of end plates if hole messed up
- Carnegie Mellon to use GARFIELD to check electric field around crimp pin insert
- CMU to look over to see if piece tolerances can be loosened to ± .001 in
- These are ok for hole position. We had tightened them for gluing purposes.
- OK if we open end plate to .005 tolerance on hole positions, need to reduce straw diameter to prevent interferences
- Conductive rubber tubes cover 30% of gas holes - ok
- Add holes for 1/4 inch survey balls in top downstream plete to match upstream (2 at 90°)
- CMU to send list of glues
- Silver Epoxy: Tra-Con TRA-DUCT 2929
- Scotchweld 190 & 270
- JLAB to specify glue for rohacel to mylar joint