Apr 29, 2010 Calorimetry
From GlueXWiki
Teleconference Time: 11:00 a.m. EDT
- ESNET and EVO session
- Phone in CC F326 is 757-269-6337
- Phone in the Regina Videoconference Suite is 306-585-4204
- Phone only if requested:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Phone line by request only.
Contents
Items for followup from previous meeting(s)
- Monitoring
- Matt to coordinate with Christina on the shipment of glass blocks and pmts/dividers for monitoring system test.
- Bcal: Testing to see if LED sources can be viewed by pmts on both sides of the module (UofR).
- Fcal
- Decision on rad hard detectors
-
Finalize invoicing details for Fcal contract (Elton and Matt)
Table of Options DRAFT
Configuration | Block Size (mm2) | Length(MM) | X0 (mm) | Sum X0 | Delta SC (mm) | Delta Pb (mm) | c1 | c2 | c3 |
---|---|---|---|---|---|---|---|---|---|
Pb glass F8-00 | 40x40 | 40 | 31 | 12.9 | - | - | 7.4? | 3.6? | 0 |
Pb glass F108 | 40x40 | 40 | 31? | 12.9 | - | - | ? | ? | 0 |
Shashlyk COMPAS | 38x38 | 500 (392) | 15.6 | 25 | 1.5 | 0.8 | 6 | 0 | 0 |
Shashlyk KOPIO PMT | 110x110 | 525 | 34 | 15 | 1.5 | 0.25 | 3.59 | 1.1 | 0.9 |
Shashlyk KOPIO APD | 110x110 | 525 | 34 | 15 | 1.5 | 0.25 | 2.77 | 1.7 | 0.27 |
PbWO4 PRIMEX | 20.5x20.5 | 180 | 8.9 | 20 | - | - | 2.6 | - | - |
See Property Table from Eugene
Tentative Agenda
- Announcements
- Review of Action Items
- Calibration/Monitoring
- FCAL
- Construction status
- Readiness Review
- To shashlyk or not to shashlyk. Options (Elton) see Table.
- BCAL
- Construction Status
- Responsibility for BCAL reconstruction software
- David Lawrence's talk at the April 6 Offline Meeting. Slide 2 summarizes history of BCAL reconstruction.
- Simulations
- Other Updates
Minutes
Attendees: