Minutes-4-22-2010
From GlueXWiki
April 15, 2010 FDC meeting
Tentative Agenda
- Production
- UVA wire stringing equipment (Brian) pin rail2, pin rail, pos meas cam, pos meas , pos meas parts, pretension screw, string table
- off-site production space planning
- Updates on:
- Electronics: PCB, cable procurement status (Fernando)
- Cathode redesign (Bill, Roger)
- FDC cabling cabling(Bill)
- Full scale prototype
- status (Lubomir)
- grounding problems (Fernando)
- cosmics tests (Beni)
- Other