Coil Test Weekly Meeting 19-Nov-2010
From GlueXWiki
Solenoid Coil Test Weekly Meeting
Location and Time
Note new meeting day
- Fri 19-Nov-2010 9:30 am ARC 428
Agenda
- Cooldown progress - All
- OSP status - Elliott
- characterization of glitches, main switch behavior - Mark
- Test plan improvements - Elliott
- Pager
- are we connected to the guard shack?
- spurious pages?
- Experience with control system - All
- be sure to document our experience
- need some additions to EWEB pages
- be sure to document our experience
- Preparation for powered operations - All
- shunt installation/wiring, connection to interlock/control system
- ground fault detection
- fast DAQ, which channels, what rates, how to coordinate time with PLC archive?
- rewire quench detector, how to balance channels?
- Hall probe
- pickup coils
- 230 V UPS on Danfysik control boards, main switch
- broken/flaky sensors/gauges/instruments
- C-glass calibrations
- vacuum gate valve interlock
- what to do about strain gauges?
- liquid level monitor/probes
- vacuum monitor/gauges
- what else?
- safety equipment, beacons, barriers, etc.
- Controls racks and interlocks - Scot, Mark S
- strain gauge and UPS interlocks
- UPS lifetime test
- PLC operations - Mark W
- status
- alarm strategy
- EPICS - Hovanes
- status
- pager status and strategy
- HMI and EWEB programming - Yi, Hovanes
- program access to archived data
- alarm screens
- long-term archive strategy
- Labview/fast DAQ - Yi, Elliott
- status
- Elog experience - Elliott
- automatic entries
- Coil repair status - George
- coil 3 at IUCF
- coil 2
- plans for coil 4
- Solenoid review 7-Dec
- PI Responsibilities during test - Jonathan
- Low power magnet testing 5A, 50A,100A - Elliott
- High power magnet testing 100-1500A - Elliott
- Identify possible turn to turn shorts during ramping - Eugene
- Assess Heim column centering in coil - George
- Assess Axial column forces - George
- Estimate LN2 and He heat leak - Jonathan
- Assess LN2 and LHe thermal siphons - Jonathan
- Preparations for testing next coil - George, Scot, Elliott
- update P&I
- splices
- yoke location
- piping adaptors
- downstream yoke spacers
- controls racks rewiring
- quench detector connections
- connectors on next coil
- fix known problems
- what else?