Aug 9, 2011 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 16:21, 26 July 2012 by Elton (Talk | contribs) (Created page with "== Action Items from previous meetings == # Develop front and back views of jumper sheets. (Jack) # Test wrapping forms (Elton) == Tentative Agenda == # Announcements # Actio...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Action Items from previous meetings

  1. Develop front and back views of jumper sheets. (Jack)
  2. Test wrapping forms (Elton)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    • SiPMs assignment for new boards
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup

Minutes

Attending: