Aug 9, 2011 SiPM Electrical and Cooling
From GlueXWiki
Revision as of 16:21, 26 July 2012 by Elton (Talk | contribs) (Created page with "== Action Items from previous meetings == # Develop front and back views of jumper sheets. (Jack) # Test wrapping forms (Elton) == Tentative Agenda == # Announcements # Actio...")
Action Items from previous meetings
- Develop front and back views of jumper sheets. (Jack)
- Test wrapping forms (Elton)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Chris)
- Light guide gluing setup
Minutes
Attending: