Aug 9, 2011 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 17:29, 26 July 2012 by Elton (Talk | contribs) (Action Items from previous meetings)

Jump to: navigation, search

Action Items from previous meetings

  1. Develop front and back views of jumper sheets. (Jack)
  2. Test wrapping forms (Elton)
  3. Order glue (and any other consumables) to glue light guides (Scot)
  4. Check new gluing jig for the light guides (Scot and Jim)

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM production testing (everyone)
    • SiPMs assignment for new boards
  5. Mechanical assembly (Jim)
  6. Temperature compensation (Jack)
  7. Electronic boards (Chris)
  8. Light guide gluing setup

Minutes

Attending: