Aug 16, 2011 SiPM Electrical and Cooling
From GlueXWiki
Revision as of 12:21, 16 August 2012 by Elton (Talk | contribs) (→Action Items from previous meetings)
Action Items from previous meetings
- Test wrapping forms (Elton)
- Decide on how to a store sorted SiPMs in preparation for installation (Fernando and Chris)
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)\
- Review requirement of 2.5 reduced gain reduction (Elton)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- SiPM production testing (everyone)
- SiPMs assignment for new boards
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Chris)
- Light guide gluing setup (Scot via e-mail)
Minutes
Attending: