Feb. 22, 2008 Tracking CDC/FDC
From GlueXWiki
Agenda
- Status of MC resolution studies (David)
- EM Background rates (David)
- Status of Kinematic Fitting (Matt)
- Signal Leakage in pi/K (new studies) pi/K Separation (GlueX doc-971)
- Previous talk pi/K Separation (GlueX doc-971)
- Status of PWA anchoring (Paul, Alexander)
- BNL-E852 tracking resolutions
- Three pi resonance generation & simulation
- DC and PID Review Schedule for preparations (Elton)
- CDC Hardware Status 22 February 2008
- FDC Hardware Status
- Update on segment-based track finding [1]
Participating
Location
The meeting will be at 11:00am in Cebaf Center F324-325.
Telephone
To connect by telephone: 1.) dial:
800-377-8846 : US 888-276-7715 : Canada 302-709-8424 : International (not a free call!)
2.) enter participant code: 39527048# (remember the "#")
Video Conferencing
The room at JLab does not have video conferencing equipment installed.
Minutes
Attendees: TBD