<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, May 3 at 08:45
- Notes from the previous 24 hours:
- RF Recovery and Tour: scheduled from 9:00-15:00, but RF recovery estimated until 17:00
- Planned Hall A pass change (several h)
- Network problems on accelerator site: [1][2][3]
-
Harp Scan
-
Production running
- Issues:
- Reports:
- Run Plan
- Thursday/Friday
- Raw mode run
- Fast raster scan (9am, 60min)
- TAC run (10am, 1 shift)
- Saturday
- Sunday
- 5am end of physics, 6am end of run
- Week 17
- AOB