July 23, 2019 DIRC
From GlueXWiki
Revision as of 13:33, 22 July 2019 by Jrsteven (Talk | contribs) (Created page with "== Meeting Information == GlueX DIRC Meeting<br> Tuesday July 23, 2019<br> 1:00 pm, EDT<br> JLab F326 <br> == Connection Using Bluejeans == # To join via Polycom room system...")
Meeting Information
GlueX DIRC Meeting
Tuesday July 23, 2019
1:00 pm, EDT
JLab F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Installation work:
- Mirror studies:
- Strongback disassembly and mirror reflectivity measurements (Bill)
- Tests of composition from oxidized surfaces (Eugene/Bill)
- Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
- Results from UV enhanced mirror in water sample with DP190
- Next steps:
- Receive mirror from Bates and have cut for additional sample pieces (Wednesday 7/24)
- Decide on epoxy for pin holes of Upper (North) OB. Apply epoxy and re-install mirror box in OB for installation
- After receiving gold-plated screws, install in upper bar boxes and proceed with installing North OB
- Mirror studies:
- Spring 2019 DIRC Commissioning Analysis (All)
- Commissioning LUT analyses (All)
- Contributions to Jerry's DIRC review article (Yunjie, All)
- Software/simulations
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB