Minutes-1-21-2010
From GlueXWiki
FDC Weekly Meeting
Date: January 21, 2010
Participants: Daniel, Simon, Beni, Eugene, Lubomir, Mark S., Bill, Kim, Fernando, Chuck, Glenn, Brian
Next Meeting: February 4, 2010
Contents
[hide]Next FDC Meeting
- The GlueX Collaboration meeting takes place next week. The next FDC Group Meeting will take place in two weeks.
General Construction Updates
- We finally figured out the leakage/pressure problems that we were having with the prototype. We identified a leak in the ground plane in one of our cathode sandwiches. We are now scratching our heads trying to figure how/if it can be repaired. In addition to a leak in the ground plane itself, we seem to be leaking through the majority of the through holes. - As we have a problem with one of our cathode sandwiches, we have reassembled the two-layer prototype and leak checked it. It is in very reasonable shape. We moved it into the cosmic ray test stand in a vertical position and its leak results and pressure readings are what we had measured in the clean room on the assembly jig. - Casey has hooked up the chamber grounds in preparation for the HV checkout work that will proceed shortly. - Casey and Mark have completed a system that mounts around the prototype to hold a source and a trigger scintillator. The system allows for horizontal and vertical translations and verniers to locate the source position relative to the chamber. - The plan now is to give Beni and few weeks to work on testing the full-scale prototype. We will make a decision shortly on when to add the third layer back into the prototype. - We still have to add the stiffening pieces to the gusset arcs for the full-scale prototype to help reduce the flexing of the structure when it is rotated into a horizontal position. These pieces have been delivered by the shop and just need some holes drilled and tapped into the existing gusset arcs for attachment. - As we could not find a system to measure the oxygen contamination in our chamber gas, Bill will instead look into the system that we already have in our gas panel. It is an antique, that was last calibrated/used back in 1995. - We need to hook up the FDC prototype gas system to a UPS as we lost gas flow this morning due to some (suspected) power glitch. - The preliminary FDC stack assembly document draft is located at: /u/group/halld/Engineering/PRELIMINARY DOCUMENTS. We will review this document after tests get underway on the full-scale prototype to update out-of-date or old procedures.
Frame Redesign Studies
- Beni has gotten word that Mihajlo Kornicer has gotten his MC code working to study photon conversions in the detector. We expect preliminary results in the next day or two. Stay tuned. - The inner frame pieces for the wire frame and cathode frames have been delivered by the JLab machine shop. We will soon proceed to assemble frames with these pieces and test their mechanical properties. Stay tuned for details.
Wire Frame Update
- The wire frame construction document is located at: /u/group/halld/Engineering/PRELIMINARY DOCUMENTS. - The parts of the jig to use for the wire electroplating operation are in our hands. They will be assembled as we find time. - We need to prepare a document for the electrical QA of the preamp connectors on the wire boards. - Kim is in the process of getting quotes for single piece boards from the board house. As soon as we have something that we understand, we will discuss it with the group. - DSC, Kim, and Fernando met on Tuesday to finalize plans for work on the wire frame circuit board work. Kim will be working full time on the redesign work starting on Monday of next week. - We are working to remove the zig-zag overlap region on the join region for the STBs and HVTBs. We may even have to move to a 4-layer board for the HV side. Decisions will be made soon.
Cathode Update
- The current draft of the cathode construction document is located at: /u/group/halld/Engineering/PRELIMINARY DOCUMENTS. - We need to prepare a document for QA/stuffing/cleaning for the cathode boards and a similar document for the cathode daughter boards and ground boards. Casey has a draft of a document that Mark S. began preparing. He will take this over and complete the document. - The cathode board material is now in Minnesota. It has been inspected by the distributor. They will send some photos to Roger. Roger will contact Allflex to see if they will store the board material until our order is ready. Stay tuned. - The next rigid-flex design meeting will take place in the first half of February. - We would like to push to get the cathode board procurement done on the time scale of this March. Stay tuned. - David Lawrence is working to give us input on the hole size in the cathode center. Stay tuned.
Cosmic Ray Test Stand
- The current version of the full-scale prototype test plan is on the GlueX portal as (GlueX-doc-1304). - A while ago we focussed on the wiggles seen in the reconstructed wire position from the cathodes (see log entry 419) in the FDC logbook. We believe that the periodicity seen is due to the algorithm Beni is using to determine the U and V centroids. Stay tuned. - To connect the full-scale prototype to the readout electronics, Fernando will design a simple translator board that allows connection from the 24-channel preamp connector to the 16-channel connectors on the ADCs and TDCs. These boards should be ready in early February. - The signal cables for the full-scale prototype are being made up by Fernando's group and should be ready shortly.
Construction Updates
- The wire sample checks are now in progress with the W&M folks. They expect to be done by the end of the first week of February assuming no unexpected work comes up for them. - DSC will meet with the IUCF Associate Director overseeing the Wire Chamber Lab on Friday to discuss planning for the Phase 3 contract. - Next IUCF meeting on Phase 3 preparations will take place in about 2 weeks. See the work plan at: Phase 3 Preparation Work - Master list on wire and cathode frame redesign work is located at: Frame Modification Work.
Work List
- The FDC short-term work list has been posted on the FDC web site. This is continually being updated and DSC welcomes any feedback or comments from the group.
Minutes prepared by Daniel. Send any comments or corrections along.