Difference between revisions of "Π polarizability Meeting Apr 14, 2021"

From GlueXWiki
Jump to: navigation, search
(Preliminary Agenda)
(Preliminary Agenda)
Line 60: Line 60:
 
## Microscope move (Elton)
 
## Microscope move (Elton)
 
##* Meeting with Richard and Jim on April 12 @ 1:30 pm.
 
##* Meeting with Richard and Jim on April 12 @ 1:30 pm.
##* Tim has remeasured the distance and the geometry can accommodate a shift of 2.31 m (not 2.6 m). We will revisit this tomorrow at the CPP design meeting.
+
##* By straddling the vacuum chamber support, we can move the microscope downstream by 280 cm.
 
## Timeline to publication
 
## Timeline to publication
 
## Table of responsibilities
 
## Table of responsibilities

Revision as of 08:42, 14 April 2021

Meeting Time And Location

09:00 EST (JLab time) Weekly Meeting

REMOTE during Covid-19

Connecting

You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):

  1. Make sure you have created a BlueJeans account via your JLab CUE account using this link:

  2. Meeting ID: 949 429 419
    • (you may need to type this in, depending how you connect)

  3. If connecting via Web Browser: click this link (no passcode is needed):

  4. If connecting via iOS or Android App:
    • Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting

  5. If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"

  6. If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above



Action Items

Preliminary Agenda

  1. Previous CPP meeting: Apr 7, 2021
  2. Announcements
  3. Action Items
  4. CPP and NPP Readiness Review
  5. Responses to the ERR. This link points to the draft response to the ERR.
    1. MWPCs (fabrication, testing) (Rory)
    2. Trigger rates (beam test analysis, expectation with target pulled back) (Ilya)
    3. Hdgeant4 (initial setup and plan for running simulations) (Mark and Beni + moral support from David)
    4. Analysis (low level reconstruction, monitoring) (David to write paragraph)
    5. CDC Coverage of electronics by one crate (Beni)
    6. MWPC gas system
    7. Tracking / extrapolation to MWPCs (Simon)
    8. Higher level analysis (e.g. PID, efficiencies and reconstruction) (Rory)
    9. Rates in MWPCs (Ilya)
    10. Microscope move (Elton)
      • Meeting with Richard and Jim on April 12 @ 1:30 pm.
      • By straddling the vacuum chamber support, we can move the microscope downstream by 280 cm.
    11. Timeline to publication
    12. Table of responsibilities
  6. GlueX Data Analysis
  7. CPP Software
  8. PID + AI
  9. Other business
  10. Next meeting

Minutes

Attending: