Difference between revisions of "Π polarizability Meeting Dec 9, 2020"

From GlueXWiki
Jump to: navigation, search
(Minutes)
 
(2 intermediate revisions by the same user not shown)
Line 49: Line 49:
 
# Previous meeting: [[π polarizability Meeting Dec 2, 2020|Dec 2, 2020]]
 
# Previous meeting: [[π polarizability Meeting Dec 2, 2020|Dec 2, 2020]]
 
# Announcements
 
# Announcements
 +
# Action Items
 
# [[CPP and NPP Readiness Review]]
 
# [[CPP and NPP Readiness Review]]
 
#* [https://www.jlab.org/physics/accexp-schedule/beamreq Experiment Scheduling Calendar]
 
#* [https://www.jlab.org/physics/accexp-schedule/beamreq Experiment Scheduling Calendar]
 
#* [https://www.jlab.org/physics/experiment_process/np-pfx Procedures for Experiments]
 
#* [https://www.jlab.org/physics/experiment_process/np-pfx Procedures for Experiments]
 +
#* [[December 3, 2020 CPP Design Meeting |Dec 3 CPP Design Meeting]]
 
#*[[GlueX-II and DIRC ERR]] (Example)
 
#*[[GlueX-II and DIRC ERR]] (Example)
 
# Beam test
 
# Beam test
Line 60: Line 62:
  
 
== Minutes ==
 
== Minutes ==
'' Attending:
+
'' Attending: Beni, David, Ilya, Mark, Rory, Vambow, Elton
 +
 
 +
# Previous meeting: [[π polarizability Meeting Dec 2, 2020|Dec 2, 2020]]
 +
# Announcements
 +
# Action Items
 +
# [[CPP and NPP Readiness Review]]
 +
#* [https://www.jlab.org/physics/accexp-schedule/beamreq Experiment Scheduling Calendar]
 +
#* [https://www.jlab.org/physics/experiment_process/np-pfx Procedures for Experiments]
 +
#* [[December 3, 2020 CPP Design Meeting |Dec 3 CPP Design Meeting]]
 +
#*[[GlueX-II and DIRC ERR]] (Example)
 +
#* Elton briefly summarized the CPP Design meeting and preparations for the Readiness Review
 +
# Beam test
 +
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4796 TOF trigger rate study with the upgraded TOF detector and optional lead shielding] (Ilya)
 +
#* Beni: Hai has requested a Trigger Specification for discussions. He will work with Ilya to produce a document that can be provided to Hai
 +
# Data Analysis (Andrew)
 +
#* Andrew asked some technical questions about analysis. David and Elton will send some examples for fitting.
 +
# Other business
 +
# Next meeting
 +
#* Dec 16. Rory: Use the time to Review status and preparations for the Readiness Review

Latest revision as of 11:19, 9 December 2020

Meeting Info.

Meeting Time And Location

9:00 EST (JLab time)

REMOTE during Covid-19

Connecting

You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):

  1. Make sure you have created a BlueJeans account via your JLab CUE account using this link:

  2. Meeting ID: 949 429 419
    • (you may need to type this in, depending how you connect)

  3. If connecting via Web Browser: click this link (no passcode is needed):

  4. If connecting via iOS or Android App:
    • Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting

  5. If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"

  6. If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above


Action Items

  1. Output FCAL hits for muon generated events in MC (Andrew)
  2. Review TOF trigger requirements with Hai Dong (Beni and Ilya)

Agenda

  1. Previous meeting: Dec 2, 2020
  2. Announcements
  3. Action Items
  4. CPP and NPP Readiness Review
  5. Beam test
  6. Data Analysis (Andrew)
  7. Other business
  8. Next meeting

Minutes

Attending: Beni, David, Ilya, Mark, Rory, Vambow, Elton

  1. Previous meeting: Dec 2, 2020
  2. Announcements
  3. Action Items
  4. CPP and NPP Readiness Review
  5. Beam test
  6. Data Analysis (Andrew)
    • Andrew asked some technical questions about analysis. David and Elton will send some examples for fitting.
  7. Other business
  8. Next meeting
    • Dec 16. Rory: Use the time to Review status and preparations for the Readiness Review