Difference between revisions of "Π polarizability Meeting Jul 15, 2020"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Minutes)
 
(4 intermediate revisions by 2 users not shown)
Line 50: Line 50:
 
## [[CPP Design Meetings]]
 
## [[CPP Design Meetings]]
 
## [[Media:D00000-00-00-1019 REV-.pdf | DIRC Installation Drawings]]
 
## [[Media:D00000-00-00-1019 REV-.pdf | DIRC Installation Drawings]]
# Data Analysis (Andrew)
+
# [[Media:ASchick_July14thCPP.pdf | Data Analysis]] (Andrew)
 
# Beam test
 
# Beam test
 
# Preparations for Jeopardy
 
# Preparations for Jeopardy
Line 59: Line 59:
 
== Minutes ==
 
== Minutes ==
  
''TBD''
+
''Attendees: Mark, Elton, Andrew, Rory, Ilya,David(last part)
<!--Attendees: Albert F., Andrew S., Elton S., Iliya L., Mark I., Rory M., Nick B., Vambow-->
+
 
 +
# Previous meeting: [[&pi; polarizability Meeting Jul 8, 2020|Jul 8, 2020]]
 +
# Announcements
 +
# Update on Engineering/Design
 +
## [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4416 Screen Shots of Mechanical Design Apr 2 and 23]
 +
## [[CPP Design Meetings]]
 +
## [[Media:D00000-00-00-1019 REV-.pdf | DIRC Installation Drawings]]
 +
# [[Media:ASchick_July14thCPP.pdf | Data Analysis]] (Andrew)
 +
#* Andrew showed new comparisons of e+e- data compared to MC.
 +
#* With new updates to the MC by Rory and making reasonable fiducial volume cuts, agreement is striking.
 +
#* The t dependence still shows some differences at low to intermediate values.
 +
#* Andrew is working with Richard to be able to use his Bethe-Heitler event generator.
 +
# Beam test
 +
#* [[CPP Test 2020 - Schedule]]
 +
# Preparations for Jeopardy
 +
#*https://www.overleaf.com/project/5e99f9be43ff67000121a18d
 +
# Other business
 +
# Next meeting

Latest revision as of 14:09, 15 July 2020

Meeting Info.

Meeting Time And Location

9:00 EST (JLab time)

CC L207

Connecting

You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):

  1. Make sure you have created a BlueJeans account via your JLab CUE account using this link:

  2. Meeting ID: 949 429 419
    • (you may need to type this in, depending how you connect)

  3. If connecting via Web Browser: click this link (no passcode is needed):

  4. If connecting via iOS or Android App:
    • Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting

  5. If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"

  6. If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above


Action Items

Agenda

  1. Previous meeting: Jul 8, 2020
  2. Announcements
  3. Update on Engineering/Design
    1. Screen Shots of Mechanical Design Apr 2 and 23
    2. CPP Design Meetings
    3. DIRC Installation Drawings
  4. Data Analysis (Andrew)
  5. Beam test
  6. Preparations for Jeopardy
  7. Other business
  8. Next meeting

Minutes

Attendees: Mark, Elton, Andrew, Rory, Ilya,David(last part)

  1. Previous meeting: Jul 8, 2020
  2. Announcements
  3. Update on Engineering/Design
    1. Screen Shots of Mechanical Design Apr 2 and 23
    2. CPP Design Meetings
    3. DIRC Installation Drawings
  4. Data Analysis (Andrew)
    • Andrew showed new comparisons of e+e- data compared to MC.
    • With new updates to the MC by Rory and making reasonable fiducial volume cuts, agreement is striking.
    • The t dependence still shows some differences at low to intermediate values.
    • Andrew is working with Richard to be able to use his Bethe-Heitler event generator.
  5. Beam test
  6. Preparations for Jeopardy
  7. Other business
  8. Next meeting