Difference between revisions of "Π polarizability Meeting Apr 21, 2021"

From GlueXWiki
Jump to: navigation, search
(Preliminary Agenda)
 
(3 intermediate revisions by 2 users not shown)
Line 51: Line 51:
 
## MWPCs (fabrication, testing) (Rory)
 
## MWPCs (fabrication, testing) (Rory)
 
## [https://userweb.jlab.org/~ilarin/cpp/trigrate_vs_tgtpos.png Trigger rates (beam test analysis, expectation with target pulled back)] (Ilya)
 
## [https://userweb.jlab.org/~ilarin/cpp/trigrate_vs_tgtpos.png Trigger rates (beam test analysis, expectation with target pulled back)] (Ilya)
## Hdgeant4 (initial setup and plan for running simulations) (Mark and Beni + moral support from David)
+
## Hdgeant4 (initial setup and plan for running simulations) (Mark and Beni)
 
## Analysis (low level reconstruction, monitoring) (David to write paragraph)
 
## Analysis (low level reconstruction, monitoring) (David to write paragraph)
 
## [[Media:CDC Crate1 4 CPP.pdf | CDC Coverage of electronics by one crate]] (Beni)
 
## [[Media:CDC Crate1 4 CPP.pdf | CDC Coverage of electronics by one crate]] (Beni)
 
## MWPC gas system
 
## MWPC gas system
## Tracking / extrapolation to MWPCs (Simon)
+
## [[Tracking / extrapolation to MWPCs]] (Simon)
 
## Higher level analysis (e.g. PID, efficiencies and reconstruction) (Rory)
 
## Higher level analysis (e.g. PID, efficiencies and reconstruction) (Rory)
 
## Rates in MWPCs (Ilya)
 
## Rates in MWPCs (Ilya)
 
## Microscope move (Elton)
 
## Microscope move (Elton)
##* Meeting with Richard and Jim on April 12 @ 1:30 pm.
+
##* Meeting with Richard and James on April 12 @ 1:30 pm.
 
##* By straddling the vacuum chamber support, we can move the microscope downstream by 280 cm.
 
##* By straddling the vacuum chamber support, we can move the microscope downstream by 280 cm.
 
## Timeline to publication
 
## Timeline to publication
Line 72: Line 72:
 
== Minutes ==
 
== Minutes ==
 
'' Attending:
 
'' Attending:
 
# Previous CPP meeting: [[π polarizability Meeting Apr 14, 2021|Apr 14, 2021]]
 
# Announcements
 
# Action Items
 
# [[CPP and NPP Readiness Review]]
 
# [https://drive.google.com/drive/folders/1aiSOVh4zWwnObV5fA0eF-OXG8YbE14pO?usp=sharing Responses to the ERR]. This link points to the draft response to the ERR.
 
## MWPCs (fabrication, testing) (Rory)
 
## [https://userweb.jlab.org/~ilarin/cpp/trigrate_vs_tgtpos.png Trigger rates (beam test analysis, expectation with target pulled back)] (Ilya)
 
## Hdgeant4 (initial setup and plan for running simulations) (Mark and Beni + moral support from David)
 
## Analysis (low level reconstruction, monitoring) (David to write paragraph)
 
## [[Media:CDC Crate1 4 CPP.pdf | CDC Coverage of electronics by one crate]] (Beni)
 
## MWPC gas system
 
## Tracking / extrapolation to MWPCs (Simon)
 
## Higher level analysis (e.g. PID, efficiencies and reconstruction) (Rory)
 
## Rates in MWPCs (Ilya)
 
## Microscope move (Elton)
 
##* Meeting with Richard and Jim on April 12 @ 1:30 pm.
 
##* By straddling the vacuum chamber support, we can move the microscope downstream by 280 cm.
 
## Timeline to publication
 
## Table of responsibilities
 
# GlueX Data Analysis
 
# CPP Software
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=5011  Amplitude errors using bootstrap method] (Elton)
 
# PID + AI
 
# Other business
 
# Next meeting
 

Latest revision as of 08:57, 21 April 2021

Meeting Time And Location

09:00 EST (JLab time) Weekly Meeting

REMOTE during Covid-19

Connecting

You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):

  1. Make sure you have created a BlueJeans account via your JLab CUE account using this link:

  2. Meeting ID: 949 429 419
    • (you may need to type this in, depending how you connect)

  3. If connecting via Web Browser: click this link (no passcode is needed):

  4. If connecting via iOS or Android App:
    • Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting

  5. If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"

  6. If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above



Action Items

Preliminary Agenda

  1. Previous CPP meeting: Apr 14, 2021
  2. Announcements
  3. Action Items
  4. CPP and NPP Readiness Review
  5. Responses to the ERR. This link points to the draft response to the ERR.
    1. MWPCs (fabrication, testing) (Rory)
    2. Trigger rates (beam test analysis, expectation with target pulled back) (Ilya)
    3. Hdgeant4 (initial setup and plan for running simulations) (Mark and Beni)
    4. Analysis (low level reconstruction, monitoring) (David to write paragraph)
    5. CDC Coverage of electronics by one crate (Beni)
    6. MWPC gas system
    7. Tracking / extrapolation to MWPCs (Simon)
    8. Higher level analysis (e.g. PID, efficiencies and reconstruction) (Rory)
    9. Rates in MWPCs (Ilya)
    10. Microscope move (Elton)
      • Meeting with Richard and James on April 12 @ 1:30 pm.
      • By straddling the vacuum chamber support, we can move the microscope downstream by 280 cm.
    11. Timeline to publication
    12. Table of responsibilities
  6. GlueX Data Analysis
  7. CPP Software
  8. PID + AI
  9. Other business
  10. Next meeting

Minutes

Attending: