Difference between revisions of "Π polarizability Meeting Mar 17, 2021"

From GlueXWiki
Jump to: navigation, search
(Action Items)
(Preliminary Agenda)
Line 50: Line 50:
 
# Action Items
 
# Action Items
 
# [[CPP and NPP Readiness Review]]
 
# [[CPP and NPP Readiness Review]]
 +
# Responses to the ERR
 +
## MWPCs (fabrication, testing)
 +
## Trigger rates (beam test analysis, expectation with target pulled back)
 +
## Simulation -hdgeant4 (initial setup and plan for running simulations)
 +
## Analysis (low level reconstruction, monitoring, higher level analysis)
 +
## Rates in MWPCs
 +
## Timeline to publication
 +
## Table of responsibilities
 
# GlueX Data Analysis
 
# GlueX Data Analysis
 
# CPP Software
 
# CPP Software

Revision as of 09:22, 16 March 2021

Meeting Time And Location

09:00 EST (JLab time) Weekly Meeting

REMOTE during Covid-19

Connecting

You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):

  1. Make sure you have created a BlueJeans account via your JLab CUE account using this link:

  2. Meeting ID: 949 429 419
    • (you may need to type this in, depending how you connect)

  3. If connecting via Web Browser: click this link (no passcode is needed):

  4. If connecting via iOS or Android App:
    • Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting

  5. If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"

  6. If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above



Action Items

  1. Draft list of responses to the ERR recommendations for discussion (Elton)

Preliminary Agenda

  1. Previous CPP meeting: Mar 10, 2021
  2. Announcements
  3. Action Items
  4. CPP and NPP Readiness Review
  5. Responses to the ERR
    1. MWPCs (fabrication, testing)
    2. Trigger rates (beam test analysis, expectation with target pulled back)
    3. Simulation -hdgeant4 (initial setup and plan for running simulations)
    4. Analysis (low level reconstruction, monitoring, higher level analysis)
    5. Rates in MWPCs
    6. Timeline to publication
    7. Table of responsibilities
  6. GlueX Data Analysis
  7. CPP Software
  8. PID + AI
  9. Other business
  10. Next meeting

Minutes

Attending: