Difference between revisions of "Π polarizability Meeting Mar 24, 2021"
From GlueXWiki
(Created page with "== Meeting Time And Location == 09:00 EST (JLab time) Weekly Meeting <br> REMOTE during Covid-19 ==Connecting== <div class="toccolours mw-collapsible mw-collapsed"> You can...") |
(→Preliminary Agenda) |
||
Line 67: | Line 67: | ||
## Table of responsibilities (Elton) | ## Table of responsibilities (Elton) | ||
# GlueX Data Analysis | # GlueX Data Analysis | ||
− | |||
− | |||
# CPP Software | # CPP Software | ||
# PID + AI | # PID + AI |
Revision as of 06:55, 24 March 2021
Meeting Time And Location
09:00 EST (JLab time) Weekly Meeting
REMOTE during Covid-19
Connecting
You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- Meeting ID: 949 429 419
- (you may need to type this in, depending how you connect)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via iOS or Android App:
- Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: (408) 740-7256 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Action Items
- Draft list of responses to the ERR recommendations for discussion (Elton)
Preliminary Agenda
- Previous CPP meeting: Mar 17, 2021
- Announcements
- Action Items
- CPP and NPP Readiness Review
- Responses to the ERR
- MWPCs (fabrication, testing) (Rory)
- Small DAQ system in ESB to test chambers when the arrive at JLab
- Trigger rates (beam test analysis, expectation with target pulled back) (Ilya)
- Hdgeant4 (initial setup and plan for running simulations) (Mark and Beni + moral support from David)
- update geometry
- check hits make sense
- Analysis (low level reconstruction, monitoring) (David to write paragraph)
- Basic factories to look at raw data + conversion to energy/time.
- Develop during the testing in ESB
- Higher level analysis (e.g. PID, efficiencies and reconstruction) (Rory)
- Rates in MWPCs (Ilya)
- Initially need a plan for running full simulations with production geometry
- Timeline to publication (Elton will make something up)
- calibration, high level analysis, amplitude analysis, CPP and NPP
- Table of responsibilities (Elton)
- MWPCs (fabrication, testing) (Rory)
- GlueX Data Analysis
- CPP Software
- PID + AI
- Other business
- Next meeting
Minutes
Attending: