Difference between revisions of "Π polarizability Meeting Mar 31, 2021"

From GlueXWiki
Jump to: navigation, search
(Preliminary Agenda)
(Preliminary Agenda)
Line 50: Line 50:
 
# Action Items
 
# Action Items
 
# [[CPP and NPP Readiness Review]]
 
# [[CPP and NPP Readiness Review]]
# [https://halldweb.jlab.org/wiki/index.php/Π_polarizability_Meeting_Mar_31,_2021 Responses to the ERR]
+
# [https://drive.google.com/drive/folders/1aiSOVh4zWwnObV5fA0eF-OXG8YbE14pO?usp=sharing Responses to the ERR]
 
## MWPCs (fabrication, testing) (Rory)
 
## MWPCs (fabrication, testing) (Rory)
 
##* Small DAQ system in ESB to test chambers when the arrive at JLab
 
##* Small DAQ system in ESB to test chambers when the arrive at JLab

Revision as of 16:34, 30 March 2021

Meeting Time And Location

09:00 EST (JLab time) Weekly Meeting

REMOTE during Covid-19

Connecting

You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):

  1. Make sure you have created a BlueJeans account via your JLab CUE account using this link:

  2. Meeting ID: 949 429 419
    • (you may need to type this in, depending how you connect)

  3. If connecting via Web Browser: click this link (no passcode is needed):

  4. If connecting via iOS or Android App:
    • Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting

  5. If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"

  6. If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above



Action Items

  1. Draft list of responses to the ERR recommendations for discussion (Elton)

Preliminary Agenda

  1. Previous CPP meeting: Mar 24, 2021
  2. Announcements
  3. Action Items
  4. CPP and NPP Readiness Review
  5. Responses to the ERR
    1. MWPCs (fabrication, testing) (Rory)
      • Small DAQ system in ESB to test chambers when the arrive at JLab
    2. Trigger rates (beam test analysis, expectation with target pulled back) (Ilya)
    3. Hdgeant4 (initial setup and plan for running simulations) (Mark and Beni + moral support from David)
      • update geometry
      • check hits make sense
    4. Analysis (low level reconstruction, monitoring) (David to write paragraph)
      • Basic factories to look at raw data + conversion to energy/time.
      • Develop during the testing in ESB
    5. CDC Coverage of electronics by one crate (Beni)
    6. Higher level analysis (e.g. PID, efficiencies and reconstruction) (Rory)
    7. Rates in MWPCs (Ilya)
      • Initially need a plan for running full simulations with production geometry
    8. Microscope move (Elton)
      • Meeting with Richard and Jim on April 12 @ 1:30 pm.
    9. Timeline to publication (Elton will make something up)
      • calibration, high level analysis, amplitude analysis, CPP and NPP
    10. Table of responsibilities (Elton)
  6. GlueX Data Analysis
  7. CPP Software
  8. PID + AI
  9. Other business
  10. Next meeting

Minutes

Attending: