Difference between revisions of "Π polarizability Meeting Mar 31, 2021"

From GlueXWiki
Jump to: navigation, search
(Minutes)
Line 87: Line 87:
 
# [https://drive.google.com/drive/folders/1aiSOVh4zWwnObV5fA0eF-OXG8YbE14pO?usp=sharing Responses to the ERR]
 
# [https://drive.google.com/drive/folders/1aiSOVh4zWwnObV5fA0eF-OXG8YbE14pO?usp=sharing Responses to the ERR]
 
## MWPCs (fabrication, testing) (Rory)
 
## MWPCs (fabrication, testing) (Rory)
##* Small DAQ system in ESB to test chambers when the arrive at JLab
+
##* Document for MWPCs in progress, half completed
 +
##* Covid situation at UMass is opening up. More undergraduates can come and re-start MWPC fabrication
 +
##* Should start discussions moving MWPCs to JLab / access of users to lab. Expect move in mid-May
 
## Trigger rates (beam test analysis, expectation with target pulled back) (Ilya)
 
## Trigger rates (beam test analysis, expectation with target pulled back) (Ilya)
 +
##* No update
 
## Hdgeant4 (initial setup and plan for running simulations) (Mark and Beni + moral support from David)
 
## Hdgeant4 (initial setup and plan for running simulations) (Mark and Beni + moral support from David)
##* update geometry
+
##* Geometry has been updated. Need to check to make sure that geometry/hits make sense
##* check hits make sense
+
 
## Analysis (low level reconstruction, monitoring) (David to write paragraph)
 
## Analysis (low level reconstruction, monitoring) (David to write paragraph)
 
##* Basic factories to look at raw data + conversion to energy/time.
 
##* Basic factories to look at raw data + conversion to energy/time.

Revision as of 11:00, 31 March 2021

Meeting Time And Location

09:00 EST (JLab time) Weekly Meeting

REMOTE during Covid-19

Connecting

You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):

  1. Make sure you have created a BlueJeans account via your JLab CUE account using this link:

  2. Meeting ID: 949 429 419
    • (you may need to type this in, depending how you connect)

  3. If connecting via Web Browser: click this link (no passcode is needed):

  4. If connecting via iOS or Android App:
    • Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting

  5. If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"

  6. If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above



Action Items

  1. Draft list of responses to the ERR recommendations for discussion (Elton)

Preliminary Agenda

  1. Previous CPP meeting: Mar 24, 2021
  2. Announcements
  3. Action Items
  4. CPP and NPP Readiness Review
  5. Responses to the ERR
    1. MWPCs (fabrication, testing) (Rory)
      • Small DAQ system in ESB to test chambers when the arrive at JLab
    2. Trigger rates (beam test analysis, expectation with target pulled back) (Ilya)
    3. Hdgeant4 (initial setup and plan for running simulations) (Mark and Beni + moral support from David)
      • update geometry
      • check hits make sense
    4. Analysis (low level reconstruction, monitoring) (David to write paragraph)
      • Basic factories to look at raw data + conversion to energy/time.
      • Develop during the testing in ESB
    5. CDC Coverage of electronics by one crate (Beni)
    6. Higher level analysis (e.g. PID, efficiencies and reconstruction) (Rory)
    7. Rates in MWPCs (Ilya)
      • Initially need a plan for running full simulations with production geometry
    8. Microscope move (Elton)
      • Meeting with Richard and Jim on April 12 @ 1:30 pm.
    9. Timeline to publication (Elton will make something up)
      • calibration, high level analysis, amplitude analysis, CPP and NPP
    10. Table of responsibilities (Elton)
  6. GlueX Data Analysis
  7. CPP Software
  8. PID + AI
  9. Other business
  10. Next meeting

Minutes

Attending: Albert, Alex, Andrew, David, Mark, Rory, Simon

  1. Previous CPP meeting: Mar 24, 2021
  2. Announcements
  3. Action Items
  4. CPP and NPP Readiness Review
  5. Responses to the ERR
    1. MWPCs (fabrication, testing) (Rory)
      • Document for MWPCs in progress, half completed
      • Covid situation at UMass is opening up. More undergraduates can come and re-start MWPC fabrication
      • Should start discussions moving MWPCs to JLab / access of users to lab. Expect move in mid-May
    2. Trigger rates (beam test analysis, expectation with target pulled back) (Ilya)
      • No update
    3. Hdgeant4 (initial setup and plan for running simulations) (Mark and Beni + moral support from David)
      • Geometry has been updated. Need to check to make sure that geometry/hits make sense
    4. Analysis (low level reconstruction, monitoring) (David to write paragraph)
      • Basic factories to look at raw data + conversion to energy/time.
      • Develop during the testing in ESB
    5. CDC Coverage of electronics by one crate (Beni)
    6. Higher level analysis (e.g. PID, efficiencies and reconstruction) (Rory)
    7. Rates in MWPCs (Ilya)
      • Initially need a plan for running full simulations with production geometry
    8. Microscope move (Elton)
      • Meeting with Richard and Jim on April 12 @ 1:30 pm.
    9. Timeline to publication (Elton will make something up)
      • calibration, high level analysis, amplitude analysis, CPP and NPP
    10. Table of responsibilities (Elton)
  6. GlueX Data Analysis
  7. CPP Software
  8. PID + AI
  9. Other business
  10. Next meeting