Π polarizability Meeting May 12, 2021

From GlueXWiki
Revision as of 11:31, 5 May 2021 by Elton (Talk | contribs) (Created page with "== Meeting Time And Location == 09:00 EST (JLab time) Weekly Meeting <br> REMOTE during Covid-19 ==Connecting== <div class="toccolours mw-collapsible mw-collapsed"> You can...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Meeting Time And Location

09:00 EST (JLab time) Weekly Meeting

REMOTE during Covid-19

Connecting

You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):

  1. Make sure you have created a BlueJeans account via your JLab CUE account using this link:

  2. Meeting ID: 949 429 419
    • (you may need to type this in, depending how you connect)

  3. If connecting via Web Browser: click this link (no passcode is needed):

  4. If connecting via iOS or Android App:
    • Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting

  5. If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"

  6. If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above



Action Items

Preliminary Agenda

  1. Previous CPP meeting: Apr 21, 2021
  2. Announcements
  3. Action Items
  4. CPP and NPP Readiness Review
  5. Responses to the ERR. This link points to the draft response to the ERR.
    1. MWPCs (fabrication, testing) (Rory)
    2. Trigger rates (beam test analysis, expectation with target pulled back) (Ilya)
    3. Hdgeant4 (initial setup and plan for running simulations) (Mark and Beni)
    4. Analysis (low level reconstruction, monitoring) (David to write paragraph)
    5. CDC Coverage of electronics by one crate (Beni)
    6. MWPC gas system
    7. Tracking / extrapolation to MWPCs (Simon)
    8. Higher level analysis (e.g. PID, efficiencies and reconstruction) (Rory)
    9. Rates in MWPCs (Ilya)
    10. Microscope move (Elton)
      • Meeting with Richard and James on April 12 @ 1:30 pm. Review at beamline meeting yesterday. Jig pieces are being ordered. Delta E=4.65 - 6.2 GeV
      • By straddling the vacuum chamber support, we can move the microscope downstream by 280 cm.
    11. Timeline to publication
    12. Table of responsibilities
  6. GlueX Data Analysis
  7. CPP Software
  8. PID + AI
  9. Other business
  10. Next meeting

Minutes

Attending: