Π polarizability Meeting May 19, 2021

From GlueXWiki
Revision as of 11:37, 19 May 2021 by Elton (Talk | contribs) (Minutes)

Jump to: navigation, search

Meeting Time And Location

09:00 EST (JLab time) Weekly Meeting

REMOTE during Covid-19

Connecting

You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):

  1. Make sure you have created a BlueJeans account via your JLab CUE account using this link:

  2. Meeting ID: 949 429 419
    • (you may need to type this in, depending how you connect)

  3. If connecting via Web Browser: click this link (no passcode is needed):

  4. If connecting via iOS or Android App:
    • Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting

  5. If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"

  6. If connecting via Polycom unit:
    • Dial 199.48.152.152 or bjn.vc
    • Enter meeting ID above



Action Items

Preliminary Agenda

  1. Previous CPP meeting: May 12, 2021
  2. Announcements
    • Screen shots of detector from Stephanie
  3. Action Items
  4. CPP and NPP Readiness Review
  5. Responses to the ERR. This link points to the draft response to the ERR.
  6. hdgeant4 updates (Beni and Simon)
  7. Log Entry 3877374 Plugin with latest changes
  8. GlueX Data Analysis
  9. CPP Software
  10. PID + AI
  11. Other business
  12. Next meeting

Minutes

Attending: Alex, Andrew, Beni, David, Ilya, Mark, Rory, Simon, Elton

  1. Previous CPP meeting: May 12, 2021
  2. Announcements
  3. Action Items
  4. CPP and NPP Readiness Review
  5. Responses to the ERR. This link points to the draft response to the ERR.
  6. hdgeant4 updates (Beni and Simon)
    • Mother volume changed to 'site' so that it would not overlap with FCAL
    • Added dead region of 10x10 cm2 into a non-sensitive area.
    • All changes in the xml, so no changes needed in the hdgeant4 code (Richard's recommendation)
    • 2" circular beam hole aperture for beam.
    • Rory: Plans to update document with best estimates of the Al honey comb. At the moment a reasonable composite is used
    • Added Pb picture frame to the geometry
    • Beni: Added geometry file to ccdb. Also included a material file in both the default and the mc_cpp versions
    • Rory: Note that the <bold> wire spacing is 0.4" (not 1.0 cm) </bold>
  7. Log Entry 3877374 Plugin with latest changes
  8. GlueX Data Analysis
  9. CPP Software
  10. PID + AI
  11. Other business
  12. Next meeting