+ | ** CD-3 signing of papers scheduled for 3rd of September | ||
+ | ** EVMS follow up review 12th and 13th of August till now went okay | ||
+ | *** this is a CD-3 requirement | ||
+ | ** Please look to detector drawings [http://www.jlab.org/Hall-D/reviews/Lehman-2008/Pre-Brief_Material-HallD/CD3_DRAWING_PACKAGE} | ||
* JSA Iniative funds | * JSA Iniative funds | ||
* PrimEx update | * PrimEx update |
Revision as of 07:43, 13 August 2008
Meeting Time and Place
The meeting will be on Wednesday August 13, 2008 at 11:00am EST. For those people at Jefferson Lab, the meeting will be in room F326/F327.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-800-377-8846 : US +1-888-276-7715 : Canada +1-302-709-8424 : International then enter participant code: 39527048# (remember the "#")
3.) EVO:
A conference has been booked under "GlueX" from 10:30am until 12:30pm (EST).
Agenda
- Announcements
- CD-3 signing of papers scheduled for 3rd of September
- EVMS follow up review 12th and 13th of August till now went okay
- this is a CD-3 requirement
- Please look to detector drawings [http://www.jlab.org/Hall-D/reviews/Lehman-2008/Pre-Brief_Material-HallD/CD3_DRAWING_PACKAGE}
- JSA Iniative funds
- PrimEx update
- The September Collaboration Meeting: GlueX-Collaboration-Sept-2008
- University of Connecticut,September 18-20, 2008
- Reports from Technical Groups
- Calorimetry
- Electronics
- Magnet
- Offline Software
- PID/TOF
- Photon Beam and Tagger
- Tracking
- Trigger/DAQ/Monitoring/Controls