Difference between revisions of "2008-08-13"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 27: Line 27:
 
** EVMS follow up review 12th and 13th of August till now went okay
 
** EVMS follow up review 12th and 13th of August till now went okay
 
*** this is a CD-3 requirement
 
*** this is a CD-3 requirement
** Please look to detector drawings [http://www.jlab.org/Hall-D/reviews/Lehman-2008/Pre-Brief_Material-HallD/CD3_DRAWING_PACKAGE}
+
** Please look to detector drawings  
 +
*** link for drawings to CD-3: [http://www.jlab.org/Hall-D/reviews/Lehman-2008/Pre-Brief_Material-HallD/CD3_DRAWING_PACKAGE]
 
* JSA Iniative funds
 
* JSA Iniative funds
 
* PrimEx update
 
* PrimEx update

Revision as of 08:44, 13 August 2008

Meeting Time and Place

The meeting will be on Wednesday August 13, 2008 at 11:00am EST. For those people at Jefferson Lab, the meeting will be in room F326/F327.

Meeting Connections

To connect from the outside:

1.) ESNET:

   Call ESNET Number 8542553 (this is the preferred connection method).

2.) Phone: (should not be needed)

  +1-800-377-8846 : US
  +1-888-276-7715 : Canada
  +1-302-709-8424 : International
   then enter participant code: 39527048# (remember the "#")

3.) EVO:

   A conference has been booked under "GlueX" from 10:30am until 12:30pm (EST).

Agenda

  • Announcements
    • CD-3 signing of papers scheduled for 3rd of September
    • EVMS follow up review 12th and 13th of August till now went okay
      • this is a CD-3 requirement
    • Please look to detector drawings
      • link for drawings to CD-3: [1]
  • JSA Iniative funds
  • PrimEx update
  • The September Collaboration Meeting: GlueX-Collaboration-Sept-2008
    • University of Connecticut,September 18-20, 2008
  • Reports from Technical Groups
    • Calorimetry
    • Electronics
    • Magnet
    • Offline Software
    • PID/TOF
    • Photon Beam and Tagger
    • Tracking
    • Trigger/DAQ/Monitoring/Controls
  • AOT

Minutes