Line 46: Line 46:
 
** [http://www-esd.fnal.gov/esd/catalog/main/lcrynim/465-spec.htm LeCroy 465 Triple 4-Fold Logic Unit (I)] - AND of remote trigger and 3 horizontal signals
 
** [http://www-esd.fnal.gov/esd/catalog/main/lcrynim/465-spec.htm LeCroy 465 Triple 4-Fold Logic Unit (I)] - AND of remote trigger and 3 horizontal signals
 
** [http://www-esd.fnal.gov/esd/catalog/main/lcrynim/465-spec.htm LeCroy 465 Triple 4-Fold Logic Unit (II)] - AND of remote trigger and 3 vertical signals
 
** [http://www-esd.fnal.gov/esd/catalog/main/lcrynim/465-spec.htm LeCroy 465 Triple 4-Fold Logic Unit (II)] - AND of remote trigger and 3 vertical signals
 +
** [http://www-esd.fnal.gov/esd/catalog/main/psnim/755-spec.htm Phillips 755 Quad 4-Fold Logic Unit] - AND of remote trigger and 4 outside VETO counters
 +
** [http://www-esd.fnal.gov/esd/catalog/main/lcrynim/429a-spec.htm LeCroy 429A Logic Fan-In/Out] - FAN-OUT of remote trigger into 10 channels for coincidence with trigger modules. The front panel switch should be set to "1x16" so that the output of the discriminated remote trigger is fanned out into all 16 OUTs.
 +
** [http://www.fnal.gov/projects/ckm/jlab/364al-spec.htm LeCroy 365AL Dual 4-Fold Logic] - Final AND to output trigger signal. The inputs into the AND will be
 +
*** the 3-way OR signal of the horizontal bars
 +
*** the 3-way OR signal of the vertical bars
 +
*** the 4-way OR signal of the VETO counters should be put in VETO
 +
**
  
 
== Beam Rates ==
 
== Beam Rates ==

Revision as of 22:28, 19 October 2011

2011 Hall B FCAL Beam Test

Schedule

Beam

  • 2011/11/19 (Sat) beam start
    • 11/19/2011 (Sat) 11/20/2011 (Sun) COMMISSIONING
    • 11/21/2011 (Mon) 12/04/2011 (Sun) 4446 4 Lin 14
    • 12/05/2011 (Mon) 12/18/2011 (Sun) 4446 4 Lin 14
    • 12/19/2011 (Mon) 12/21/2011 (Wed) 4446 4 Lin 3
  • 12/22/2011 (Thu) 01/03/2012 (Tue) WINTER DOWN
    • 01/04/2012 (Wed) 01/13/2012 (Fri) 2528 3 Cir 10 special Hall A Ee
    • 01/14/2012 (Sat) 01/24/2012 (Tue) 2254 2 Cir 11
    • 01/25/2012 (Wed) 01/26/2012 (Thu) 4446 4 Lin 2 special Hall A
    • 01/27/2012 (Fri) 02/10/2012 (Fri) 2254 2 Cir 15
    • 02/11/2012 (Sat) 02/24/2012 (Fri) 5542 5 Lin 14
    • 02/25/2012 (Sat) 03/09/2012 (Fri) 5542 5 Lin 14
    • 03/10/2012 (Sat) 03/23/2012 (Fri) 5542 5 Lin 14
    • 03/24/2012 (Sat) 04/06/2012 (Fri) 5542 5 Lin 14
    • 04/07/2012 (Sat) 04/14/2012 (Sat) 4446 4 Lin 8
    • 04/15/2012 (Sun) 04/16/2012 (Mon) EXCHANGE TARGET, NO BEAM
    • 04/17/2012 (Tue) 04/18/2012 (Wed) 4446 4 Lin 2
    • 04/19/2012 (Thu) 04/20/2012 (Fri) 4446 4 Lin 2
    • 04/21/2012 (Sat) 04/22/2012 (Sun) 4446 4 Lin 2
    • 04/23/2012 (Mon) 04/24/2012 (Tue) 5542 5 Lin 2
    • 04/25/2012 (Wed) 04/26/2012 (Thu) 5542 5 Lin 2
    • 04/27/2012 (Fri) 04/28/2012 (Sat) 5542 5 Lin 2
    • 04/29/2012 (Sun) 04/30/2012 (Mon) 5542 5 Lin 2
    • 05/01/2012 (Tue) 05/04/2012 (Fri) 2254 2 Cir 4
    • 05/05/2012 (Sat) 05/09/2012 (Wed) INSTALL RASTER, SET BEAMLINE, NO BEAM
    • 05/10/2012 (Thu) 05/17/2012 (Thu) 2254 2 Lin 8 e+ HD performance tests
  • 05/17/2012 (Thu) Start of 12 GEV SHUTDOWN

Construction

  • Target date to finish construction - 11/02/2011 (Wed)
  • Drive from IU to JLab for installation - 11/03/2011 (Thur)~

Electronics

  • Have put together NIM modules at IU, no need to borrow any NIM modules
  • Have tested inputs/outputs, all units working
  • Output widths of all NIM modules with adjustable widths set to 50 ns. As long as the rate of electrons coming in is less than 20 MHz,

we should be fine (the total rate on the CLAS tagger should be on this order).

Beam Rates

Rates measured on floor with scintillators
Rates measured on floor with scintillating fibres


  • The difference between the two figures seems to stem from the scintillating fibres having

directional dependence on the incoming electrons. Without any veto on the incoming electron direction, it seems we will be saturated with scattered electrons.

  • Also note that these measurements were done near the end of the beam, where there is

lots of scattering as the main beam exits the vacuum.