2011 Hall B FCAL Beam Test

From GlueXWiki
Revision as of 16:50, 3 October 2011 by Kmoriya (Talk | contribs)

Jump to: navigation, search

2011 Hall B FCAL Beam Test

Schedule

Beam

  • 2011/11/19 (Sat) beam start ~ 05/17/2012 (Thu) shutdown
    • 11/19/2011 (Sat) 11/20/2011 (Sun) COMMISSIONING
    • 11/21/2011 (Mon) 12/04/2011 (Sun) 4446 4 Lin 14
    • 12/05/2011 (Mon) 12/18/2011 (Sun) 4446 4 Lin 14
    • 12/19/2011 (Mon) 12/21/2011 (Wed) 4446 4 Lin 3
    • 12/22/2011 (Thu) 01/03/2012 (Tue) BREAK
    • 01/04/2012 (Wed) 01/13/2012 (Fri) 2528 3 Cir 10 special Hall A Ee
    • 01/14/2012 (Sat) 01/24/2012 (Tue) 2254 2 Cir 11
    • 01/25/2012 (Wed) 01/26/2012 (Thu) 4446 4 Lin 2 special Hall A
    • 01/27/2012 (Fri) 02/10/2012 (Fri) 2254 2 Cir 15
    • 02/11/2012 (Sat) 02/24/2012 (Fri) 5542 5 Lin 14
    • 02/25/2012 (Sat) 03/09/2012 (Fri) 5542 5 Lin 14
    • 03/10/2012 (Sat) 03/23/2012 (Fri) 5542 5 Lin 14
    • 03/24/2012 (Sat) 04/06/2012 (Fri) 5542 5 Lin 14
    • 04/07/2012 (Sat) 04/14/2012 (Sat) 4446 4 Lin 8
    • 04/15/2012 (Sun) 04/16/2012 (Mon) EXCHANGE TARGET, NO BEAM
    • 04/17/2012 (Tue) 04/18/2012 (Wed) 4446 4 Lin 2
    • 04/19/2012 (Thu) 04/20/2012 (Fri) 4446 4 Lin 2
    • 04/21/2012 (Sat) 04/22/2012 (Sun) 4446 4 Lin 2
    • 04/23/2012 (Mon) 04/24/2012 (Tue) 5542 5 Lin 2
    • 04/25/2012 (Wed) 04/26/2012 (Thu) 5542 5 Lin 2
    • 04/27/2012 (Fri) 04/28/2012 (Sat) 5542 5 Lin 2
    • 04/29/2012 (Sun) 04/30/2012 (Mon) 5542 5 Lin 2
    • 05/01/2012 (Tue) 05/04/2012 (Fri) 2254 2 Cir 4
    • 05/05/2012 (Sat) 05/09/2012 (Wed) INSTALL RASTER, SET BEAMLINE, NO BEAM
    • 05/10/2012 (Thu) 05/17/2012 (Thu) 2254 2 Lin 8 e+ HD performance tests
    • 05/17/2012 (Thu) Start of 12 GEV SHUTDOWN

Links