Difference between revisions of "2012 Software Review Planning Meeting: Apr. 13, 2012"
From GlueXWiki
Line 33: | Line 33: | ||
#* Introductory talk ([http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1949 preliminary sildes]) with notes. | #* Introductory talk ([http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1949 preliminary sildes]) with notes. | ||
#* Numbers for the table | #* Numbers for the table | ||
− | #** [https:// | + | #** Software Manpower within collaboration ([https://halldsvn.jlab.org/repos/trunk/docs/offline/ProjectProgress/manpower_survey.pdf PDF],[https://halldsvn.jlab.org/repos/trunk/docs/offline/ProjectProgress/manpower_survey.ods ODS]) |
− | #** [[2012 Offline Computing Schedule]] ([https://halldsvn.jlab.org/repos/trunk/docs/offline/ProjectProgress/OfflineComputingActivities2012.pdf PDF ] | + | #** [[2012 Offline Computing Schedule]] ([https://halldsvn.jlab.org/repos/trunk/docs/offline/ProjectProgress/OfflineComputingActivities2012.pdf PDF ]) |
− | #** Computing Resources within the Collaboration | + | #** Computing Resources within the Collaboration ([https://halldsvn.jlab.org/repos/trunk/docs/offline/ProjectProgress/ComputingResources.pdf PDF] , [https://halldsvn.jlab.org/repos/trunk/docs/offline/ProjectProgress/ComputingResources.ods ODS]) |
#** Simulation requirements (GRID, CPU, disk space) | #** Simulation requirements (GRID, CPU, disk space) | ||
#** Reconstruction requirements (tape, CPU, disk) | #** Reconstruction requirements (tape, CPU, disk) |
Revision as of 09:56, 13 April 2012
Main Hall-D Software Review Page
Contents
Connecting
Phone:
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Agenda
- Previous Meeting (Apr. 6, 2012)
- Status of Review Organization (JLab organizers)
- Committee (Van Haus(chair), Marchand, McBride, Purske, +1??)
- Charge
- Agenda
- Time-line for preparations
-
April 10 - April 13:
- How many talks each hall will be presenting in the morning session
- Ideas/suggestion for the parallel session
- April 23-27 - talk outlines
- April 30 - Written material for the review (RMP? See Apr. 11 e-mail from Curtis).
- May 14/15 - First draft of presentations for dry run.
- May 24/25 or 29/30 - Final talks with timed presentations.
- June7/8 Software Review at JLab.
-
- Organization of Hall-D preparations for Review
- Introductory talk (preliminary sildes) with notes.
- Numbers for the table
- Software Manpower within collaboration (PDF,ODS)
- 2012 Offline Computing Schedule (PDF )
- Computing Resources within the Collaboration (PDF , ODS)
- Simulation requirements (GRID, CPU, disk space)
- Reconstruction requirements (tape, CPU, disk)
- Analysis requirements (offsite transfer bandwidth/volume, CPU/GPU)
- Software Milestones/Challenges
- Calibration/Alignment
Minutes
TBD
Action Items
TBD