Difference between revisions of "2012 Software Review Planning Meeting: Apr. 13, 2012"

From GlueXWiki
Jump to: navigation, search
(Action Items)
(Action Items)
Line 49: Line 49:
 
=Action Items=
 
=Action Items=
  
''TBD''
 
 
# Curtis will produce a draft outline for the morning review talks. This is now attached to the [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1949 draft talk] that he placed on the wiki.
 
# Curtis will produce a draft outline for the morning review talks. This is now attached to the [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1949 draft talk] that he placed on the wiki.
 +
# Curtis will contact Regina and UConn about local computing resources and resources committed by GlueX to the OSG.

Revision as of 15:56, 13 April 2012

Main Hall-D Software Review Page


Connecting

Phone:

  • +1-866-740-1260 : US+Canada
  • +1-303-248-0285 : International
  • then enter participant code: 3421244# (remember the "#").
  • or www.readytalk.com (and code without the #)

Agenda

  1. Previous Meeting (Apr. 6, 2012)
  2. Status of Review Organization (JLab organizers)
    • Committee (Van Haus(chair), Marchand, McBride, Purske, +1??)
    • Charge
    • Agenda
  3. Time-line for preparations
    • April 10
    • April 13:
      • How many talks each hall will be presenting in the morning session
      • Ideas/suggestion for the parallel session
    • April 23-27 - talk outlines
    • April 30 - Written material for the review (RMP? See Apr. 11 e-mail from Curtis).
    • May 14/15 - First draft of presentations for dry run.
    • May 24/25 or 29/30 - Final talks with timed presentations.
    • June7/8 Software Review at JLab.
  4. Organization of Hall-D preparations for Review
    • Introductory talk (preliminary sildes) with notes.
    • Numbers for the table
      • Software Manpower within collaboration (PDF,ODS)
      • 2012 Offline Computing Schedule (PDF )
      • Computing Resources within the Collaboration (PDF , ODS)
      • Simulation requirements (GRID, CPU, disk space)
      • Reconstruction requirements (tape, CPU, disk)
      • Analysis requirements (offsite transfer bandwidth/volume, CPU/GPU)
    • Software Milestones/Challenges
    • Calibration/Alignment

Minutes

TBD


Action Items

  1. Curtis will produce a draft outline for the morning review talks. This is now attached to the draft talk that he placed on the wiki.
  2. Curtis will contact Regina and UConn about local computing resources and resources committed by GlueX to the OSG.